Laserfiche WebLink
Last Revised: 7/11/2025 Page 4 Agreement <br />WPCP Sludge-Soil-Cement Stabilization and Fill Project No. 2025-6020 <br /> <br />CONTRACT PRICE SCHEDULE <br /> <br />No. Bid Item Unit Qty. Unit Price Task Total <br />1.0 Pre-Mobilization Submittals LS 1 $50,000 $50,000 <br />2.0 Mobilization LS 1 $525,000 $525,000 <br />2.5 Site Clearing and Demolition LS 1 $45,000 $45,000 <br />3.0 Sludge-Soil-Cement Stabilization CY <br />sludge 30,200 $85.00 $2,567,000 <br />4.0 <br />Post-Stabilization Import Fill <br />Procurement, Delivery, Placement, <br />and Compaction <br />CY bank 41,5001 $46.00 $1,909,000 <br />5.0 Cleanup and Dewatering System LS 1 $225,000 $225,000 <br />6.0 Demobilization LS 1 $130,000 $130,000 <br />7.0 <br />Quality Control Implementation, <br />Project Management, and <br />Administration <br />LS 1 $850,000 $850,000 <br />Total Proposed Costs, Base: $6,301,000 <br />1 As described in the Special Provisions, the Contract Price Schedule includes the maximum fill bank volume; <br />the contracted unit price shall hold for any quantity between 20,000 CY and maximum quantity shown. <br /> <br />All proposed costs are inclusive of labor, materials, equipment, subcontractors, markups, other direct and <br />indirect costs. <br /> <br />Docusign Envelope ID: F22D94EC-CD2A-4D08-AF55-EDF1D641560E