Laserfiche WebLink
Last Revised: 6/16/2025 Page 5 Agreement <br />Steven Taylor Sanctity of Life Pavilion Project No. 2022.0340 <br /> <br />22 ORGANIC SOIL AMENDMENTS PER <br />SECTION 800-1.2.4 3610.00 SF $1.80 $6,498.00 <br />23 SOD AND STOLENS (TURF GRASS) <br />PER SECTION 800-1.4.5 3610.00 SF $2.90 $10,469.00 <br />24 IRRIGATION: SYSTEM & <br />MATERIALS PER SECTION 800-2 1.00 LS $38,000.00 $38,000.00 <br />25 SOD AREA PREPARATION PER <br />SECTION 801 3610.00 SF $1.48 $5,342.80 <br />26 FINISH GRADING PER SECTION 801- <br />2 852.00 SF $5.45 $4,643.40 <br />27 STRUCTURAL FOOTING FOR <br />ARTWORK (BY OTHERS) 1.00 LS $0.00 $0.00 <br /> <br /> <br />TOTAL BID: Three Hundred Sixty-One Thousand Eighty-Seven Dollars and Eighty-Eight Cents <br /> (In Words) <br /> <br />TOTAL BID: $361,087.88 <br /> (In Figures) <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: BB2CB2C4-80E1-4EC8-828D-9F05A99531F4