My WebLink
|
Help
|
About
|
Sign Out
Home
CSA Nichols Consulting Eng. Lewelling Blvd Class IV Bike Ways Prg.
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2025
>
CSA Nichols Consulting Eng. Lewelling Blvd Class IV Bike Ways Prg.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 4:51:08 PM
Creation date
12/17/2025 3:55:17 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/24/2025
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised June, 2025 <br />NCE for Lewelling Blvd. Class IV Bike Ways Project Exhibit A – Page 8 of 9 <br />Task 5C Deliverables: Electronic copy (PDF and MS Word) of Bid Set PS&E. The electronic files for <br />the final construction plans, specifications, and engineer’s estimate will be in AutoCAD 2024, MS Word, <br />and MS Excel, respectively. <br /> <br />Task 6 – Bidding and Construction Support Services <br /> <br />6A Bidding Support Services <br /> <br />NCE will provide the City with assistance during the advertisement and bidding period of the Project <br />including attending the pre-bid conference, responding to questions about the project design, and <br />preparation of any addenda and/or clarifications to the P S&E that are deemed necessary. NCE has <br />included up to 31 hours of staff time for bidding support. Any effort beyond that will be on a time and <br />materials basis at an additional cost. <br />Task 6A Deliverables: Attend pre-bid meetings; Prepare responses to questions received regarding <br />project design; Prepare bid addenda as necessary; and assist with bid responsiveness (as needed). <br /> <br />6B Construction Support Services and Record Drawings <br /> <br />NCE will provide up to 117hours of support services to the City during construction. At a minimum, <br />these services are anticipated to include attendance at the pre -construction conference, reviewing <br />contractor material submittals and responding to contractor RFIs, field verification of localized repairs <br />(roadway and curb), curb ramp layouts, providing recommendations for any necessary construction <br />changes due to unforeseen field conditions, reviewing construction for acceptance, and preparing <br />record drawings from marked as-built plans supplied by the City’s contractor. This task does not <br />provide any field inspection services. If effort beyond the estimated hours is necessary, NCE staff time <br />will be delivered on a time-and-materials basis at an additional cost. <br />Task 6B Deliverables: Attend pre-construction meeting and up to two (2) field meetings, assist with <br />services described above, prepare and submit record drawings based upon the Contractor’s <br />representation of actual construction (one electronic copy in AutoCAD and PDF formats). <br /> <br />Task 7 – Utility Location Survey (GPR) at Signalized Intersection Corners <br /> <br />Using GPR, NCE’s utility locator, Psomas, will field locate utility alignments and depths for utility mains <br />and laterals for utilities within sidewalk and immediately adjacent roadway shoulder areas identified for <br />curb extensions and traffic signal modifications to the extent that GPR methods can detect utilities. <br />Assumed intersections to be surveyed include Wicks Boulevard, Calgary Street, Farnsworth Street, <br />Dewey Street, Andover Street, and Washington Avenue. GPR along utility mains will be marked at <br />various locations along the segment, and the accuracy of the electronic depths will depend on the soil <br />conditions and utility material. Traffic control will not be provided as location efforts will remain at or <br />adjacent to the sidewalk or medians. Pressure washing of paint marks is excluded from this scope. <br />Task 7 Deliverables: Marked utility depth and alignments and electronic collection of utility <br />information. <br /> <br />Deliverables Format <br /> <br />Development Plans: PDF <br />Docusign Envelope ID: 213129C2-DE35-4B27-B32D-B0EE23A6898E
The URL can be used to link to this page
Your browser does not support the video tag.