My WebLink
|
Help
|
About
|
Sign Out
Home
Ord 2025-016 Building Code
CityHall
>
City Clerk
>
City Council
>
Ordinances
>
2025
>
Ord 2025-016 Building Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 4:16:15 PM
Creation date
12/19/2025 4:15:35 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
12/1/2025
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
building or structure have been submitted, provided that adequate information and <br />detailed statements have been filed complying with pertinent requirements of this Code. <br />The holder of such permit for the foundation or other parts of a building or structure shall <br />proceed at the holder’s own risk with the building operation and without assurance that a <br />permit for the entire structure will be granted. <br />107.3.4 Design professional in responsible charge. <br />107.3.4.1 General. <br />When it is required that documents be prepared by a registered design professional, the <br />Building Official shall be authorized to require the owner to engage and designate on the <br />building permit application a registered design professional who shall act as the registered <br />design professional in responsible charge. If the circumstances require, the owner shall <br />designate a substitute registered design professional in responsible charge who shall <br />perform the duties required of the original registered design professional in responsible <br />charge. The Building Official shall be notified in writing by the owner if the registered <br />design professional in responsible charge is changed or is unable to continue to perform <br />the duties. <br />The registered design professional in responsible charge shall be responsible for reviewing <br />and coordinating submittal documents prepared by others, including phased and deferred <br />submittal items, for compatibility with the design of the building. <br />Where structural observation is required by Section 1704, the statement of special <br />inspections shall name the individual or firms who are to perform structural observation <br />and describe the stages of construction at which structural observation is to occur (see <br />also duties specified in Section 1705). <br />107.3.4.2 Deferred submittals. <br />For the purposes of this section, deferred submittals are defined as those portions of the <br />design that are not submitted at the time of the application and that are to be submitted <br />to the Building Official within a specified period. <br />Deferral of any submittal items shall have the prior approval of the Building Official. The <br />registered design professional in responsible charge shall list the deferred submittals on <br />the construction documents for review by the Building Official. <br />Documents for deferred submittal items shall be submitted to the registered design <br />professional in responsible charge who shall review them and forward them to the <br />Building Official with a notation indicating that the deferred submittal documents have <br />been reviewed and been found to be in general conformance to the design of the building. <br />Exhibit A <br />Ordinance No. 2025-016 Page 15 of 43
The URL can be used to link to this page
Your browser does not support the video tag.