My WebLink
|
Help
|
About
|
Sign Out
Home
Ord 2025-016 Building Code
CityHall
>
City Clerk
>
City Council
>
Ordinances
>
2025
>
Ord 2025-016 Building Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 4:16:15 PM
Creation date
12/19/2025 4:15:35 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
12/1/2025
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
112.1 Connection of service utilities. <br />No person shall make connections from a utility, source of energy, fuel or power to any <br />building or system that is regulated by this Code for which a permit is required, until <br />released by the Building Official. <br />112.2 Temporary connection. <br />The Building Official shall have the authority to authorize the temporary connection of the <br />building or system to the utility source of energy, fuel or power. <br />112.3 Authority to disconnect service utilities. <br />The Building Official shall have the authority to authorize disconnection of utility service to <br />the building, structure or system regulated by this Code and the Codes referenced in case <br />of emergency where necessary to eliminate an immediate hazard to life or property. The <br />Building Official shall notify the serving utility, and wherever possible the owner and <br />occupant of the building, structure or service system of the decision to disconnect prior to <br />taking such action. If not notified prior to disconnecting, the owner or occupant of the <br />building, structure or service system shall be notified in writing, as soon as practical <br />thereafter. <br />SECTION 113 <br />BOARDS OF APPEALS <br />113.1 General. <br />In order to hear and decide appeals of orders, decisions or determinations made by the <br />building official relative to the application and interpretation of this code, there shall be <br />and is hereby created a Building Board of Appeals. <br />The Board shall consist of three members, each of whom shall be qualified by experience <br />and training to pass upon matters pertaining to building construction, and shall include an <br />Architect, a Civil Engineer and a licensed General Contractor, as well as two alternates who <br />shall be Architects or Civil Engineers. <br />The Building Official shall be an ex officio member and shall act as Secretary to the Board. <br />The members of the Building Board of Appeals shall be appointed by the City Council and <br />shall hold office at its pleasure. The Building Board of Appeals shall adopt reasonable rules <br />and regulations for conducting its business. <br />113.2 Scope of authority. <br />Exhibit A <br />Ordinance No. 2025-016 Page 23 of 43
The URL can be used to link to this page
Your browser does not support the video tag.