My WebLink
|
Help
|
About
|
Sign Out
Home
Ord 2025-016 Building Code
CityHall
>
City Clerk
>
City Council
>
Ordinances
>
2025
>
Ord 2025-016 Building Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 4:16:15 PM
Creation date
12/19/2025 4:15:35 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
12/1/2025
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
percent (25%) with Low Power Level 2 EV Ready, and ten percent (10%) with Level 2 <br />EV Capable according to 2022 California Green Building Standards Code requirements. <br /> <br />4.106.4.1 - Amended. <br /> <br />4.106.4.1 One- and two-family dwellings and town-houses with attached private garages. <br />4.106.4.1.1 New Construction. One parking space provided shall be a Level 2 EV Ready <br />space. If a second parking space is provided, it shall be provided with a Level 1 EV Ready <br />space. <br /> <br />4.106.4.2 – Amended. <br />4.106.4.2 Multifamily dwellings with residential parking facilities. <br />4.106.4.2.1 New Construction. Forty percent (40%) of dwelling units with parking spaces <br />shall be EVCS with Level 2 EV Ready. ALMS shall be permitted to reduce load when multiple <br />vehicles are charging. Sixty percent (60%) of dwelling units with parking spaces shall be <br />provided with at minimum a Level 1 EV Ready space. EV ready spaces and EVCS in <br />multifamily developments shall comply with California Building Code, Chapter 11A, Section <br />1109A. EVCS shall comply with the accessibility provisions for EV chargers in the California <br />Building Code, Chapter 11B. <br />Exceptions: <br />Affordable housing shall comply with the following instead. <br />1. Fifteen percent (15%) of dwelling units with parking spaces shall be EVCS with Level <br />2 EV Ready. ALMS shall be permitted to reduce load when multiple vehicles are <br />charging. <br />2. Twenty-five percent (25%) of dwelling units with parking spaces shall be provided <br />with a Low Power Level 2 EV Ready space. <br />3. Sixty percent (60%) of dwelling units with parking spaces shall be provided with at <br />minimum a Level 1 EV Ready space. <br /> <br />Section 4.106.4.2.1 - Deleted in its entirety. <br />Section 4.106.4.2.2 - Deleted in its entirety. <br />4.106.4.3 – Amended. <br />4.106.4.3 Electric vehicle charging stations (EVCS). Electric vehicle charging stations <br />required by Section 4.106.4.2 shall comply with Section 4.106.4.3. <br />Exception: Electric vehicle charging stations serving public accommodations, public housing, <br />motels, and hotels shall not be required to comply with this section. See California Building <br />Code, Chapter 11B, for applicable requirements. <br />Exhibit E <br />Ordinance No. 2025-016 Page 6 of 13
The URL can be used to link to this page
Your browser does not support the video tag.