My WebLink
|
Help
|
About
|
Sign Out
Home
Agreement_-_Westland_Contractor_Inc_-_Sanita
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2026
>
Agreement_-_Westland_Contractor_Inc_-_Sanita
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2026 12:40:36 PM
Creation date
4/2/2026 3:47:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/17/2026
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Last Revised: March 2026 Page 4 Agreement <br />Sanitary Sewer Point Repairs 2024-25 and Floresta Boulevard Sanitary Sewer Replacement Project No. 2024.0120 <br /> <br />CONTRACT PRICE SCHEDULE – ADDENDUM NO. 2 <br /> <br />Item <br />No. Description <br />Estimated <br />Quantity <br />(A) <br />Unit of <br />Measure <br />Item UNIT <br />Price <br />(in Figures) <br />(B) <br />TOTAL <br />PRICE <br />(in <br />Figures) <br />(AxB) <br />1. <br /> <br />Mobilization, per Section 7-3.4 <br /> <br />1 LS 25,000 25,000 <br />2. <br /> <br />Temporary Traffic Control – <br />Level 1, per Part 6 Section 600 <br /> <br />81 <br /> <br />SEG 75 6,075 <br />3. <br /> <br />Temporary Traffic Control – <br />Level 2, per Part 6 Section 600 <br /> <br />3 <br /> <br />SEG 100 300 <br />4. <br /> <br />Temporary Traffic Control – <br />Level 3, per Part 6 Section 600 <br /> <br />Not Used <br /> <br /> <br /> <br /> <br /> <br />5. <br /> <br />Pipe Cleaning & CCTV <br />Inspection, per Part 5 Section <br />500-1.1 <br /> <br />20,000 <br /> <br />LF 1 20,000 <br />6. <br /> <br />Trench Excavation & Backfill, <br />0’-5’ Depth, per Part 3 Sections <br />306-3, 306-5, 306-6 & 306-12 <br /> <br /> 470 <br /> <br />LF 290 136,300 <br />7. <br /> <br />Trench Excavation & Backfill, <br />5’-8’ Depth, per Part 3 Sections <br />306-3, 306-5, 306-6 & 306-12 <br /> <br />521 <br /> <br />LF 295 153,695 <br />8. <br /> <br />Trench Excavation & Backfill, <br />8’-11’ Depth, per Part 3 <br />Sections 306-3, 306-5, 306-6 & <br />306-12 <br /> <br /> 377 <br /> <br />LF 305 114,985 <br />9. <br /> <br />Trench Excavation & Backfill, <br />11’-15’ Depth, per Part 3 <br />Sections 306-3, 306-5, 306-6 & <br />306-12 <br /> <br />Not Used <br /> <br /> <br /> <br /> <br /> <br />10. <br /> <br />Point Repair, 4-inch Pipeline <br />Replacement, per Part 3 Section <br />306-7 <br /> <br />8 <br /> <br />LF 300 2,400 <br />11. Point Repair, 6-inch Pipeline <br />Replacement, per Part 3 Section <br />306-7 <br /> <br /> 755 <br /> <br />LF 325 245,375 <br />12. Point Repair, 8-inch Pipeline <br />Replacement, per Part 3 Section <br />306-7 <br /> <br /> 415 <br /> <br />LF 326 135,290 <br />Docusign Envelope ID: 8769F825-94E9-44D2-9DDF-ECE4FE869A08
The URL can be used to link to this page
Your browser does not support the video tag.