Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and <br />Gates & Associates, Inc for Staff Augmentation Exhibit A – Page 11 of 31 <br />o Existing Conditions Plans for all landside above grade elements, below grade wet <br />and dry utilities, shoreline and Marina elements. <br />o Erosion Control Plans and Details <br />o Demolition Plans- Landside <br />▪ Building and materials demolition <br />▪ Wet and Dry Utility demolition <br />o Demolition Plans - Marine side <br />▪ Dock removal, guide piles, gangways, abutments, and utilities <br />▪ Drawings for reconfiguring the shoreline at the locations described in Task <br />2 above. Design criteria will include exposure to waves and storms, Phase <br />1 park grades, and geotechnical conditions including slope stability and <br />settlement <br />o Civil Site Plan <br />o Surcharge Grading and/or Ground Improvement Plans, as necessary <br />o Rough Grading Plan raising grades to 2070 Sea level rise elevations. <br />o Typical Civil Site Sections <br />o Grading and Drainage Plans <br />o Civil Utility Plans <br />o Fire Access Plan <br />o Import soil plan for planting areas <br />o Prefabricated Building Plans <br />o Landscape Layout Plans <br />o Layout enlargements of: <br />▪ Interim Mulford Point Overlooks (2) <br />o Landscape Materials Plans <br />o Landside Planting Plans and Details integrating ReScape requirements including <br />native planting buffers, coastal planting, Lawn areas, Stormwater Treatment <br />basins, windbreak planting, and habitat planting <br />o Irrigation Masterplan for controller systems and both permanent and temporary <br />irrigation systems <br />o Environmental Graphic Signage Plans for Package 1 <br />▪ Bay Trail Sign <br />▪ Park identification / Entry sign <br />▪ Mileage markers <br />▪ Historical replacement plaque for Oyster Beds Mosaic <br />▪ Interpretive and Educational Signage Plan and Elevations for up to 9 signs <br />▪ Support on text & technical markups for signage <br />o Preliminary construction details for Landscape work including: <br />▪ Planting, Boulders, Import soil, Seat walls, Site Furniture, Drinking <br />Fountains, Bay Trail, Pavement Sections, <br />o Preliminary construction details for all Civil, Coastal, Electrical, Geotechnical, and <br />Structural work. <br />o Shoreline improvements Plans along the park edges <br />DocuSign Envelope ID: 30A47DAA-8ADC-4C81-A393-00F3D4407ED9Docusign Envelope ID: 13C1466D-0AAC-4076-BFEB-08C6F962971ADocusign Envelope ID: D3886DBE-B91A-48B8-8B13-98FC0D0AA5C3