Laserfiche WebLink
Estimate <br />Date <br />01/03/26 <br />Estimate No. <br />105 <br />Name/Address <br />Monarch Bay Golf Club <br />13800 Monarch Bay <br />San Leandro CA 94577 <br />Project <br />Fj construction inc <br />1345manor dr <br />San Pablo ca 94806 <br />Item Description Quantity Cost Total <br />Demo Work to be on Golf club feild on south side by <br />Number 16th field bathrooms. <br />Remove existing rot wood siding of T1-11 <br />Clean out and haul away. <br />Labor only. $2600.00 <br />haling fee and dump cost. $950.00 <br />3,550.00 3,550.00T <br />Siding Install new strutural plywood on existing 2x4 <br />framing. OSB 4'x8'. <br />Labor only $2100.00 <br />Cost of new plywood and nail. $740.00 <br />2,840.00 2,840.00T <br />Siding Install new V rustic hardy Artisian siding prime. <br />iNstall 5-1/4 hardy trim around door and corners. <br />Install new waterproof paper over new plywood. <br />Seal around. <br />Install new metal vents around the builiding truses. <br />Seal around with caulking sealant. <br />Labor only. $8,478.00 <br />Materials only. $5,320.00 <br />13,798.00 13,798.00T <br />Painting Full repaint of same existing colors of building. 3,310.00 3,310.00T <br />Tile prepation.Clean out flooring by grainding areas need it. <br />seal with a stain block humidity as it can. <br />Match a 6"x6" tile as the other stall next to. <br />Put new grout. <br />8,560.00 8,560.00T <br />Total <br />Page 1 <br />Docusign Envelope ID: D7C2CDE2-E885-402E-AF2C-2A9FA4695775