My WebLink
|
Help
|
About
|
Sign Out
Home
Agreement_-_Apena_Engineering_Inc_-_Small_Tr
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2026
>
Agreement_-_Apena_Engineering_Inc_-_Small_Tr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 1:20:41 PM
Creation date
5/6/2026 1:19:20 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />10 March 2026 Page 1 of 8 Agreement <br />Small TCD Installations Project No. 2017.0540 <br /> <br /> <br />CITY OF SAN LEANDRO <br />STATE OF CALIFORNIA <br /> <br /> <br />AGREEMENT <br /> <br />THIS AGREEMENT is made at San Leandro, California, as of <br /> , by and between APENA ENGINEERING, INCORPORATED, hereinafter called Contractor, <br />and the CITY OF SAN LEANDRO, a municipal corporation, hereinafter called City, who agree as <br />follows: <br /> <br />Recitals <br /> <br />The City has awarded a contract to the Contractor for performing the work hereinafter mentioned in <br />accordance with the sealed proposal of said Contractor and of proceedings had and taken by the City <br />Council of the City leading up thereto: <br /> <br />1. WORK TO BE DONE: The work to be done consists of fabricating and installing stormwater trash <br />capture Devices and doing all appurtenant work in place and ready for use, all as shown in the plans and <br />described in the specifications entitled “Small Trash Capture Device Installations” now on file in the <br />office of the Engineer of said City. <br /> <br />2. TIME OF PERFORMANCE: The work under this contract shall commence and be completed in <br />accordance with the times therefore prescribed in the specifications for said work. <br /> <br />3. PAYMENT: The City will pay the Contractor for the performance of said work the prices as stated <br />in the Contract Price Schedule, and at the times and in the manner prescribed in the specifications. <br /> <br />4. COMPONENT PARTS: This Agreement shall consist of the following documents, each of which <br />is on file in the office of the Engineer of said City, and all of which are incorporated herein and made a <br />part hereof by reference thereto: <br /> <br />A. This Agreement and Contract Price Schedule <br />B. Notice to Bidders <br />C. Proposal Requirements <br />D. Accepted Proposal <br />E. Special Provisions <br />F. Plans (Attachments 1-3 in Special Provisions) <br />G. Standard Specifications <br />H. Faithful Performance Bond <br />I. Payment Bond <br />J. Maintenance Bond <br />K. Project Addenda, if any <br /> <br />Docusign Envelope ID: 66BE2211-F1D8-4A58-A21D-7D3612189AF0 <br />March 27, 2026 | 4:14:22 PM PDT
The URL can be used to link to this page
Your browser does not support the video tag.