My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2026-076 Heron Bay Engineer's Report FY 26-27
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2026
>
Reso 2026-076 Heron Bay Engineer's Report FY 26-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2026 8:17:52 PM
Creation date
6/8/2026 8:17:31 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
6/8/2026
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of San Leandro <br />2026/2027 Heron Bay MAD 96-3 Page 5 <br /> <br />B. Mitigation and Monitoring <br />Mitigation of the Heron Bay project was accomplished by re-construction of marshlands, <br />tidal marshlands, and upland or high ground for wildlife habitat. In order to verify that the <br />habitat was healthy, and in order to identify maintenance requirements, a monitoring report <br />was prepared annually and submitted to the involved regulatory agencies for the first 10 <br />years after marsh re-construction, at which point the restoration of the marshlands was <br />considered a success and formal monitoring has ended. <br /> <br />C. District Reserve Fund <br />The goal of the District is to maintain a Maintenance Reserve Fund in the amount of <br />$300,000 to fund capital improvements and unexpected or emergency repairs. With the <br />current scheduled Capital Improvement Projects, withdrawals from the reserve fund are <br />anticipated for the coming fiscal year. <br /> <br /> <br />D. Capital Improvement Projects <br />Shoreline Trail Repairs <br />Purchase and install rock along the shoreline of the maintenance area to stabilize the <br />shoreline trail after storm damage in December 2024 and to prevent future erosion from <br />high tide due to sea-level rise. <br /> <br />Hydrology Study <br />A comprehensive study of the marshlands’ hydrology has not been conducted since the <br />start of the re-construction in the mid-1990s. To ensure the optimal health of the tidal <br />community, as well as the marshlands’ connectivity with Estudillo Channel and San <br />Francisco Bay, a new hydrological study is recommended. This study is funded in FY <br />24/25 and will be finalized in FY 26/27. <br /> <br />Long Beach Restoration Design Project <br />City will work on a comprehensive study and apply for grant funding for the restoration of <br />Long Beach, a sandspit that provides wildlife habitat for California wildlife and marsh. <br />Failure to restore and protect Long Beach from erosion and breaches may result in the <br />loss of favorable habitat (sandspit and marsh) for endangered and threatened species. <br />The City plans to hire a consultant to seek and write grants for the funding of the <br />construction of the Long Beach Restoration Project. <br /> <br />Interpretive Signs <br />The interpretive sign project will be on hold until further notice pending funding availability. <br />Design and construct 6 interpretive signs along the Heron Bay trail to replace existing <br />signs that are in disrepair. Content and graphics to be recreated from photographs and <br />printed onto new panels for installation on new sign structures. <br />Exhibit A <br />Resolution No. 2026-076 Page 8 of 32
The URL can be used to link to this page
Your browser does not support the video tag.