My WebLink
|
Help
|
About
|
Sign Out
Home
CSA_-_Nichols_Consulting_Engineers_-_Developm
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2026
>
CSA_-_Nichols_Consulting_Engineers_-_Developm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2026 12:40:37 PM
Creation date
6/29/2026 12:02:09 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
4/28/2026
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised 04/16/2026 <br />NCE for Pavement Cut Impact Fee Study Exhibit A – Page 4 of 5 <br />refine the presentation materials to ensure accuracy, clarity, and consistency with the City’s <br />communication objectives. The cost assumes one in-person presentation. <br /> <br />Deliverables <br />PowerPoint Presentation <br /> <br />Task III – Draft and Final Reports <br />Upon completion of the analysis under Task IB, NCE will prepare a draft study report for the City to <br />review. Upon receipt of the comments on the draft report, NCE will complete the final report for <br />submittal. The report will include the following: <br />o Introduction/background <br />o Results of literature review <br />o Technical approach <br />o Results of structural analysis <br />o Results of functional analysis <br />o Strategy of developing fee <br />o Recommendation and implementation of fee <br />o Comparison of results with other studies <br /> <br />Deliverables <br />Draft and Final Report (electronic) <br />This task includes labor related to drafting a report with all information gathered from Task I, addressing <br />one round of City’s comments followed by finalizing the report. <br /> <br />Task IV – Public Outreach and Presentations <br />NCE will assist the City with up to three additional presentations, which may include meetings with the <br />Facilities and Transportation Commission, City Council, or other stakeholders following completion of <br />the draft pavement fee study. <br /> <br />NCE has extensive experience delivering similar presentations to both technical and non-technical <br />audiences. Technical groups such as advisory committees often prefer in-depth discussion of analytical <br />methods and results, while policy-focused audiences (e.g., City Council) typically emphasize key <br />findings and recommendations. NCE will tailor the presentation materials and messaging to each <br />audience and provide City staff with the level of support desired. <br /> <br />This task includes coordination with City staff, development of all presentation materials, and <br />attendance and delivery at up to three specified meetings or events. Meetings may be conducted in- <br />person or virtually and the scope includes travel time and related accommodation necessary to <br />participate in two in-person meetings and one virtual meeting. <br /> <br />Task V – Alternative Forms of Revenue Generation (Optional Task) <br />NCE will identify and evaluate additional opportunities to generate pavement-related revenue from utility <br />work activities within the City that are outside the scope of the primary pavement fee study. This may <br />include consideration of heavy construction vehicle impact fee, waste vehicle fee or other fee <br />mechanisms implemented by peer agencies. <br />Docusign Envelope ID: F4FCBFC6-F136-48C5-BF44-69A3B4443EB2
The URL can be used to link to this page
Your browser does not support the video tag.