Laserfiche WebLink
<br />Non-Professional Services Agreement between <br />City of San Leandro and Therma Page 6 of 19 <br />In addition to complying with all other safety regulations, Contractor shall abide by any and <br />all other City requirements contained in any specifications, special conditions or manuals, <br />which shall be made available by City upon request. <br /> <br />Contractor shall provide and maintain all necessary safety equipment such as fences, <br />barriers, signs, lights, walkways, guards, and fire prevention and fire-fighting equipment <br />and shall take such other action as is required to fulfill its obligations under this section. It <br />is the intent of the City to provide a safe working environment under normal conditions. <br />Contractor is advised that city’s operations and property are inherently hazardous because <br />of conditions such as confined spaces, potentially explosive atmospheres, and possible <br />exposure to pathogens. <br /> <br />Contractor shall maintain all portions of the jobsite in a neat, clean, and sanitary condition <br />at all times. If required by the City, toilets shall be furnished by Contractor where needed <br />for use of its employees and their use shall be strictly enforced. Contractor shall not use <br />the City's existing sanitary facilities, unless previously authorized by the City. <br /> <br />Contractor shall keep adequate first aid facilities and supplies available and instruction in <br />first aid for its employees shall be given. <br /> <br />City reserves the right to require that Contractor bring onto the project or engage the <br />services of a licensed safety engineer at any time during the term of this Agreement. If <br />Contractor does not have a licensed safety engineer on staff, then City may re quire that <br />Contractor engage a subcontractor or subconsultant as the project’s safety engineer. <br />Contractor shall bear all costs in connection with meeting the requirements of this section. <br /> <br />Section 4. INSURANCE REQUIREMENTS. Before fully executing or beginning work under this <br />Agreement, Contractor, at its own cost and expense, unless otherwise specified below, shall procure the <br />types and amounts of insurance listed below against claims for injuries to persons or damages to property <br />that may arise from or in connection with the performance of the wo rk hereunder by the Contractor and its <br />agents, representatives, employees, and subcontractors. Consistent with the following provisions, <br />Contractor shall provide proof satisfactory to City of such insurance that meets the requirements of this <br />section and under forms of insurance satisfactory in all respects , and that such insurance is in effect prior to <br />beginning work. <br /> <br /> Contractor shall maintain the insurance policies required by this section throughout the term of this <br />Agreement. The cost of such insurance shall be included in the Contractor's bid. Contractor shall not allow <br />any subcontractor to commence work on any subcontract until Contractor has obtained all insurance <br />required herein for the subcontractor(s) and provided evidence to City that such insurance is in effect. <br />VERIFICATION OF THE REQUIRED INSURANCE SHALL BE SUBMITTED AND MADE PART OF THIS <br />AGREEMENT PRIOR TO EXECUTION. Contractor shall maintain all required insurance listed herein for <br />the duration of this Agreement. <br /> <br />4.1 Workers’ Compensation. <br /> <br />Docusign Envelope ID: F483A0C8-A8D1-8730-82ED-F11CFC7340C9