Laserfiche WebLink
Even more troubling: San Leandro Chief Building <br />Official Michael Jeffery observed in his March 28, <br />2022 memorandum that annual visual inspections <br />might have resulted in earlier, less costly repairs. He <br />recommended obtaining another proposal and <br />exploring complete replacement. [2, Exhibit B] <br /> <br />These records raise several questions: <br />•Why wasn't the 2016 engineered flood-protection proposal <br />reconsidered during the 2022 review? <br />•Was anyone evaluating whether the proposed expenditure <br />could also address the previously identified flood vulnerability? <br />•What was the final cost of the repairs, and how much was <br />ultimately passed through to residents? <br /> <br />3.The City's contradictory planning documents: <br />•The City's 2023–2031 Housing Element, page 3-50, states that <br />approximately 1,000 western San Leandro properties had been <br />removed from the 100-year floodplain designation as of 2016 <br />and describes seawall construction along Mission Bay's <br />western edge as part of that process. [3] <br />•Yet the City's 2025 Environmental Hazards Element, page 7- <br />12, describes construction of seawalls at locations including <br />Mission Bay's western edge as a future requirement. [4] <br />•The engineered seawall proposed in 2016 was never <br />constructed. What exists is the masonry wall, not the <br />engineered concrete flood barrier identified in Staff Report 16- <br />174. <br />The City must reconcile these statements and identify the actual flood <br />protections on which its planning and mapping representations are based. <br /> <br />4.The December 31, 2022 flooding <br />