My WebLink
|
Help
|
About
|
Sign Out
Home
2026-11-02 Correspondence_Item 5c (El Nino)
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2026
>
Packet 11022026
>
2026-11-02 Correspondence_Item 5c (El Nino)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2026 9:09:55 AM
Creation date
11/3/2026 9:09:03 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Even more troubling: San Leandro Chief Building <br />Official Michael Jeffery observed in his March 28, <br />2022 memorandum that annual visual inspections <br />might have resulted in earlier, less costly repairs. He <br />recommended obtaining another proposal and <br />exploring complete replacement. [2, Exhibit B] <br /> <br />These records raise several questions: <br />•Why wasn't the 2016 engineered flood-protection proposal <br />reconsidered during the 2022 review? <br />•Was anyone evaluating whether the proposed expenditure <br />could also address the previously identified flood vulnerability? <br />•What was the final cost of the repairs, and how much was <br />ultimately passed through to residents? <br /> <br />3.The City's contradictory planning documents: <br />•The City's 2023–2031 Housing Element, page 3-50, states that <br />approximately 1,000 western San Leandro properties had been <br />removed from the 100-year floodplain designation as of 2016 <br />and describes seawall construction along Mission Bay's <br />western edge as part of that process. [3] <br />•Yet the City's 2025 Environmental Hazards Element, page 7- <br />12, describes construction of seawalls at locations including <br />Mission Bay's western edge as a future requirement. [4] <br />•The engineered seawall proposed in 2016 was never <br />constructed. What exists is the masonry wall, not the <br />engineered concrete flood barrier identified in Staff Report 16- <br />174. <br />The City must reconcile these statements and identify the actual flood <br />protections on which its planning and mapping representations are based. <br /> <br />4.The December 31, 2022 flooding <br />
The URL can be used to link to this page
Your browser does not support the video tag.