Laserfiche WebLink
<br />The central question: Why was an opportunity to invest <br />in engineered flood protection rejected, while residents were <br />subsequently required to help finance repairs to the existing <br />wall? <br /> <br />2. From BSM: The December 31, 2022 flooding and current drainage <br />readiness <br /> Residents must receive a documented explanation of the 2022 flooding <br />and evidence that the conditions contributing to that event have been <br />addressed. <br /> <br />BSM must provide: [8,9,10,11] <br />• A map identifying all park-owned storm drains, pumping <br />equipment, drainage outlets, and related facilities, including how <br />they connect to City or County systems. <br />• Records of pump operation, inspections, maintenance, failures, <br />and repairs associated with the December 2022 storm. <br />• Fuel delivery records, fuel storage capacity, emergency fuel- <br />supply arrangements, and backup-power capabilities. <br />• Documentation of corrective actions taken following the flooding. <br />• The current inspection and maintenance schedules for all <br />drainage pumps, emergency generators, and associated <br />equipment. <br />• Results of recent operational tests, including testing under backup <br />power. <br />• A written winter-readiness protocol identifying who monitors storm <br />forecasts, verifies fuel supplies, checks equipment, receives failure <br />alarms, and responds when a system fails. <br /> <br />We must have evidence that the system works, not <br />assurances that it should work. <br /> <br />3. From BSM: Emergency preparedness and resident safety <br />California Health and Safety Code §18603 and Title 25, California Code <br />of Regulations §1013 establish specific responsibilities for mobilehome <br />park emergency preparedness. <br />BSM must provide: : [8,9,10,11]