The resolution never ties reopening to the completion and structural sign- <br />off of all four slide locations (including Phase 1 storm-damage repairs at <br />Sites 1 and 4, which are funded separately and scheduled for construction <br />in 2027). Because Section 1 does not explicitly condition reopening on the <br />completion of repairs across Sites 1, 2, 3, and 4, the resolution leaves <br />ambiguity about how the two separate funding tracks and construction <br />phases interlock before traffic is permitted. <br /> <br />Section 5: Reporting Without Action Gates <br />5. Regular Progress Reports. "The City Manager shall report to the City Council <br />Facilities Committee no less frequently than every 120 days, the City’s activities <br />related to reopening of Lake Chabot Road." <br />The “why”- Ambiguity: Routing updates exclusively to the Facilities <br />Committee every four months without requiring full Council review of the <br />geotechnical findings before reopening decisions are made reduces public <br />transparency on whether Sites 2 and 3 were truly cleared for permanent <br />loads. <br /> <br />Finally, this draft Resolution repeatedly uses the WUI Go! study as a basis for taking the <br />actions proposed. Will this study be made available to the public, so that we can fully <br />understand the scenarios, the methods used, and the evacuation routes examined? If <br />public funds are to be used to repair Lake Chabot Road on an accelerated schedule, <br />the basis for the decision should be in the public record. Thank you for accepting these <br />comments, and I look forward to the public discussion. <br /> <br />Sincerely, <br /> <br />/s/ <br /> <br />James Maes <br /> <br /> <br />