My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent 2011 0516
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0516
>
8I Consent 2011 0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2011 2:45:10 PM
Creation date
5/12/2011 5:29:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0516
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0516
Reso 2011-097
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br /> APPROVED AND <br /> STAFF REPORT FORWARDED <br /> TO CITY COUNCIL <br /> DATE: May 16, 2011 Stephen L. Hollister <br /> City Manager <br /> TO: Stephen L. Hollister, City M ;ger <br /> FROM: Uchenna Udemezue, Directed <br /> 1� <br /> Engineering and Transportatilapypartment <br /> BY: Keith R. Cooke Principal Eigineer <br /> Engineering and Transport ion Department 1. 76 <br /> SUBJECT PROJECT /PROJECT DESCRIPTION: <br /> RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A <br /> MEMORANDUM OF UNDERSTANDING (MOU) BETWEEN THE CITY OF SAN <br /> LEANDRO AND THE ALAMEDA COUNTY TRANSPORTATION COMMISSION (ACTC) <br /> RELATING TO THE INTERSTATE 880 /DAVIS STREET - WESTGATE PARKWAY <br /> INTERCHANGE PROJECT. <br /> SUMMARY AND RECOMMENDATION <br /> Staff recommends adoption of a resolution authorizing the City Manager to enter into a <br /> Memorandum of Understanding (MOU) between the City and the Alameda County <br /> Transportation Commission (ACTC) for the planning, design and construction of improvements <br /> for the Interstate 880 (1 -880) / Davis Street - Westgate Parkway Interchange project in <br /> coordination with the southbound I -880 High - Occupancy Vehicle (HOV) Lane Improvements <br /> project. <br /> BACKGROUND <br /> In November 2006, the citizens of the State of California passed SB 1266 - Proposition 1B "The <br /> Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006." The <br /> bond included $4.5 billion for Corridor Mobility Improvements; a portion of which Alameda <br /> County will receive for the design and construction of several projects, including extending a <br /> HOV lane for southbound 1 -880 through San Leandro. The $108 million HOV lane project will <br /> extend the southbound HOV lane from just south of Marina Boulevard to approximately <br /> Hegenberger Road. The HOV lane project will require the reconstruction of both the Davis <br /> Street and Marina Boulevard overcrossings. To minimize the disruption of traffic and <br /> inconvenience to San Leandro residents, staff recommended that the improvements to the I- <br /> 880/Davis Street - Westgate Parkway Interchange be coordinated with the design and construction <br /> of the southbound HOV lane on 1 -880, which will be managed by the ACTC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.