My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2011 1107
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 1107
>
8G Consent 2011 1107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2011 4:44:38 PM
Creation date
11/1/2011 5:02:42 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/7/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 1107
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1107
Reso 2011-186
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: p City of San Leandro <br />Meeting Date: November 7, 2011 <br />Staff Report <br />File Number: 11 -223 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.G. <br />TO: City Council <br />FROM: Lianne Marshall <br />Interim City Manager /Executive Director <br />BY: Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW: James O'Leary, Interim Finance Director <br />TITLE: Staff Report for Approving Plans and Specifications and Calling for Bids for the <br />Bancroft Avenue and 136th Avenue Traffic Signal Project, Project No. <br />11- 150 -38 -330; State Project No. SR2SL- 5041(038) <br />:7 Elsie] LTA LTA l:401l17_ II_Q01K <br />Staff recommends approval of plans and specifications and call for bids for the subject <br />project. <br />Background <br />The intersection of Bancroft Avenue and 136th Avenue is currently a four -way <br />stop - controlled intersection on a route connecting the San Leandro High School Main <br />Campus and the Korematsu 9th Grade Campus. Before and after school hours, the <br />intersection is highly congested due to the large number of pedestrians and vehicles <br />converging on this location. <br />Analysis <br />To increase safety at the intersection, staff determined that converting this intersection from <br />four -way stop - controlled to signal - controlled would be the appropriate method to control <br />vehicular, bicycle, and pedestrian traffic. <br />The project will construct a new traffic signal system with bicycle detection and a separate <br />pedestrian signal phase that will permit simultaneous pedestrian crossings in all directions. <br />City of San Leandro Page 1 Printed on 11/1/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.