My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2021 0315
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0315
>
8B Consent 2021 0315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:53:12 PM
Creation date
3/10/2021 2:53:04 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/15/2021
Retention
PERM
Document Relationships
Reso 2021-044 San Francisco Bay Restoratio Auth for Long Beach Resto
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: March 15, 2021 <br />Staff Report <br />Agenda Section:File Number:21-035 CONSENT CALENDAR <br />Agenda Number:8.B. <br />TO:City Council <br />FROM:Fran Robustelli <br />Interim City Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:Susan Hsieh <br />Finance Director <br />TITLE:Staff Report for a City of San Leandro City Council Resolution to Approve and <br />Authorize the Interim City Manager to Accept and Appropriate Grant Funds of <br />$514,500 from the San Francisco Bay Restoration Authority for a Planning Study <br />for the Long Beach Restoration Project <br />SUMMARY AND RECOMMENDATIONS <br />The City was awarded grant funds from the San Francisco Bay Restoration Authority (SFBRA) of <br />$514,500 to conduct environmental studies and community engagement, prepare a 35% <br />complete conceptual design of the preferred alternative, develop a cost estimate, and identify <br />permitting needs for the restoration of the Long Beach within the Robert’s Landing Shoreline <br />area. <br />Staff recommends the City Council approve and authorize the Interim City Manager to accept and <br />appropriate $514,500 in grant funds from SFBRA for the subject project. <br />BACKGROUND <br />In fall 2020, SFBRA awarded the City of San Leandro $514,5000 in Measure AA grant funding to <br />perform design studies of the Robert’s Landing Shoreline Long Beach Restoration project. The <br />grant will provide for planning studies of the restoration work, including environmental studies and <br />community engagement, to prepare 35% complete conceptual design of the preferred alternative, <br />to develop a cost estimate, and to identify permitting needs for the restoration. <br />The proposed project is a multi-phased project that begins with a planning study, which will result <br />in conceptual plans and an engineering cost estimate. It is anticipated that successful completion <br />of the proposed planning studies will result in grant funding for the restoration project. <br />Identifying appropriate restoration options for the beach is the primary focus of this study. Beach <br />Page 1 City of San Leandro Printed on 3/10/2021 <br />16
The URL can be used to link to this page
Your browser does not support the video tag.