My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2006 Group 4 Architecture Reserach + Planning Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2006
>
Agmt 2006 Group 4 Architecture Reserach + Planning Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2006 9:22:59 AM
Creation date
11/1/2006 7:41:24 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/6/2006
Retention
PERM
Document Relationships
Reso 2006-022
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT A-I <br />DET AILS OF DESIGN <br /> <br />Consultant shall exercise due professional care so that design shall be done in accordance <br />with the California Building Standards Code. <br /> <br />The scope of this contract includes all architecture and engineering services as described <br />in Exhibit A required to complete the work. No work shown on the plans or listed in the <br />specifications shall be 'design build' unless it is specifically listed herein, or approved in <br />writing by the City. The interior portion ofthe fire suppression sprinkler system (if so <br />equipped), storefront or curtain wall may be design build. All exterior piping up to and <br />including the fire service riser shall be designed under this contract. storefront and <br />curtain wall <br /> <br />Unique, proprietary, or experimental designs and materials are prohibited. <br /> <br />Specification shall be CSI format. Front end specifications (section 0000 - 0999) shall <br />be prepared by the City. Consultant shall prepare all other specifications. Consultant <br />shall coordinate the work with the front end specifications prepared by the City. <br />Performance specifications are prohibited. Specifications shall be coordinated with the <br />plans. <br /> <br />A soils report that contains recommendations for design and construction will be <br />provided by the City. Design work shall be done in accordance with the <br />recommendations. Consultant shall communicate with the soils engineer as required to <br />clarify or understand the recommendations. The soils report is not a construction <br />document; construction requirements shall be included and shown completely on the <br />plans and in the specifications. The City shall be responsible to secure a review of the <br />plans at 70% and 100% CD by the soils engineer to verify conformance with the <br />recommendations. <br /> <br />The City of San Leandro has established a budget for construction of improvements as <br />described in the contract. Consultant shall be responsible for designing within the <br />budget, should estimates or bids indicate that the contingency is below 7% then the <br />contractor shall redraw the plans as required to make the estimate match the budget. <br /> <br />The City has a standard door hardware specification guideline. All work shown shall <br />conform to said guideline. <br /> <br />The City has standard plans that indicate details of construction of many site <br />improvements. All work shown shall conform to the standard plans. <br /> <br />The City has a standard fire alarm control panel. All new fire alarm control panels shall <br />conform to the standard. <br /> <br />Senior Center <br />Project No. 210-18-116 <br />COBG - Rev. 3/15/04 <br /> <br />2/6/06 <br />Page 23 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.