My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2006 Harris Design
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2006
>
Agmt 2006 Harris Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2007 12:26:17 PM
Creation date
11/29/2006 11:15:06 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/20/2006
Retention
PERM
Document Relationships
Reso 2006-126
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1.0 Preliminary Design <br /> <br />(Completed previously by Harris Design under separate contract) <br /> <br />2.0 DesiJm Development (30% Construction Documents) <br /> <br />2.01 Kick-Off Meeting <br /> <br />Meet with City Staff to verify project schedule, review scope of construction, establish lines of <br />communication, and verify the City submittal and plan review process. Walk the site with Staff to <br />review and confirm the proposed improvements. Prepare written consultation minutes and <br />distribute to City staff. <br /> <br />2.02 Horticultural Soils Testing and Analysis <br />Collect samples of in-place topsoil. Submit to Soil and Plant Laboratory for testing and analysis <br />of physical and chemical properties, and for recommendation of soil preparation materials and <br />procedures. <br /> <br />2.03 Prepare Electronic Base Sheets <br /> <br />Using the topographic survey as a base, prepare base sheets at 30 scale in AutoCAD format to <br />define the proposed physical improvements. <br /> <br />2.04 Design Development Drawings <br /> <br />Prepare the following plans to the 30% completion level: <br />· Schematic layout plan <br />· Schematic irrigation plan <br />· Schematic drainage and grading plan <br /> <br />2.05 Preliminary Specifications <br /> <br />An outline of the technical specification sections, quantity estimates, and the bid fonn will be <br />prepared. Specifications will be in Greenbook 2003 (with 2004 / 2005 amendments) format. <br /> <br />2.06 Construction Cost Estimate <br /> <br />An estimate of probable construction cost will be prepared. The cost estimate will be compared to <br />the available funding. Should the cost estimate exceed available financial resources, appropriate <br />project modifications such as phasing or additive alternate bid items will be reviewed with City <br />Staff, and incorporated into the project design going forward. <br /> <br />2.07 Submittal- 30% PS&E Deliverables <br /> <br />Up to three sets of hard-copy prints of plans, specifications, and estimates will be submitted to <br />City Staff for review. At a minimum, this submittal shall include: <br />· Title Sheet with list of all proposed drawings <br />. Prototype sheet border <br />. 100% completed topographic survey <br />· Existing utilities as identified by the topographic survey <br />· Proposed utility points of connection <br />. Potential utility conflicts or tie-in (Areas for potholing) <br />. Existing right of way, easements, and property lines based on record data only <br /> <br />Bancroft Middle School Playfields <br />Project No. 210-38-257 <br /> <br />October 25, 2006 <br />Page 17 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.