Laserfiche WebLink
<br />SAN LEANDRO ADMINISTRATIVE CODE <br /> <br />TITLE 12 <br /> <br />PUBLIC WORKS <br /> <br />Chapter 5 <br /> <br />Uniform Wastewater Discharge Regulations <br /> <br />I ,,'..11 Other <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />(c) For Classification C Users. Industrial and other large users shall be assessed user <br />charges based on measured discharges of wastewater flow, BOD, and SS. Such <br />measurement shall be obtained from monitoring facilities installed on private property at <br />the points of discharge to the sewer system, unless another location is approved by the <br />Manager. Both installation and operating costs ofthe monitoring facilities shall be at the <br />sole expense of the user. Frequency of monitoring shall be determined by the Manager. <br />Sampling and testing shall be performed by City staff and shall be paid for by the user in <br />accordance with San Leandro Administrative Code ~6.4.100. In the event that City staff <br />are unable to take samples and make tests during a billing period, an average of the test <br />results for the prior twelve month period shall be used to estimate BOD and SS <br />discharges for the billing period. The Manager shall have the discretion of not using an <br />unusually high measurement if it is judged to be unrepresentative of a user's long-term <br />use of the wastewater system and/or can be explained by a one-time event. <br /> <br />User charges shall include a demand charge and a loading charge. Demand charges shall <br />be based on the average day (using normal work days) for the peak month discharge for <br />the prior fiscal year or on an estimate of peak month parameters as provided for in <br />subparagraph (d) below. If a User elects to submit an estimate of this peak month <br />demand rather than use the prior year's peak moth, the User must demonstrate to the <br />Manager's satisfaction that the User has or will soon implement substantial changes in <br />plant processes which are likely to result in substantial reductions in the peak month <br />discharge. Otherwise, the prior year's peak month demand shall be used to assess <br />demand charges for the following fiscal year. The monthly demand charge will remain <br />constant throughout the fiscal year except as provided for in subparagraph (d) below and <br />shall be obtained by multiplying the quantity of each billing parameter (for the average <br />day of the peak month) by the appropriate unit cost shown belm,\' as listed in San Leandro <br />Administrative Code Q6.4.100. <br /> <br />Parameter <br />I4ew <br /> <br /> <br /> <br /> <br />Effective <br /> <br /> <br />Demand Chani!c <br /> <br />Gallons Per Day <br /> <br />Unit Cast <br />$67,740.17 <br /> <br />Unit Cost <br />$71,514.52 <br /> <br />Unit Cast <br />$81,965.97 <br /> <br />BGf} <br />gg <br />COlmection <br /> <br />Pounds Per Day <br />Pounds Per Day <br />Baeh <br /> <br />~ <br />$4:46 <br />~ <br /> <br />~ <br />$4,.9+ <br />~ <br /> <br />n#f <br />~ <br />~ <br /> <br />Department Responsible for Revision: Public Works <br />05/19/2003 05/01/2006 <br /> <br />Chapter 12.5 <br />Page 5 <br />