Laserfiche WebLink
<br />40 San Leandro Marina <br />San Leandro, Ca 94577 <br /> <br />10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br />the first page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled <br />"Seal and Signature of Registered Professional with report/design responsibility," as in the <br />following example. <br /> <br />Seal and Signature of Registered Professional with <br />report/design responsibility. <br /> <br />10.12 InteQration. This Agreement, including the scope of work attached hereto and <br />incorporated herein as Exhibit A, represents the entire and integrated agreement between <br />City and Consultant and supersedes all prior negotiations, representations, or agreements, <br />either written or oral. <br /> <br /> <br />"_,_..........~m'~.'~....."",...."""".........~N_"~..~~-----.... <br /> <br />CONSULTANT <br /> <br />~~ <br /> <br />CITY OF SAN LEANDRO <br /> <br />)~(h1anis, City Manager <br /> <br />Tom Roberts, Project Director <br /> <br />Attest: <br /> <br />~ttUl\ ~ <br />Marian Handa, City Clerk <br /> <br />Approved as to Form: <br /> <br /> <br />2002 <br />187376 <br /> <br />Consulting Services Agreement between <br />City of San Leandro and Environmental Science Associates <br /> <br />Page 13 of 13 <br />