My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2006 EIP Associates
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2006
>
Agmt 2006 EIP Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2007 4:06:48 PM
Creation date
1/23/2007 4:06:42 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/18/2006
Retention
PERM
Document Relationships
Reso 2006-109
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />· Republic Avenue / Merced Street <br />· Fairway Drive / Merced Street <br />· Fairway Drive / Miller Street <br />· Fairway Drive Overpass / eastbound and westbound Fairway Drive Frontage Roads <br /> <br />The final list of analysis intersections will be prepared using a screening analysis and input from <br />the City. Based on the preliminary project trip generation and distribution, Fehr & Peers will <br />conduct a screening analysis. All intersections in the project vicinity that would be affected by at <br />least 50 new peak hour trips will be considered for more detailed analysis. If the final list of <br />analysis intersections exceeds 25, a budget adjustment may be required. In addition, freeway <br />mainline and ramp junction operations at the 1-880/Marina Boulevard interchange will be <br />evaluated. <br /> <br />The analysis will include the evaluation of the following scenarios: <br />· Existing Conditions <br />· 2008 Without Project (2008 No Project) <br />· 2008 With Project Retail <br />· 2012 Without Project (2010 No Project) <br />· 2012 With Project Retail and Phase 1 of Medical Center <br />· 2025 Without Project (2025 No Project) <br /> <br />2025 With Project BuildoutTask 4.2a - Project Initiation. Fehr & Peers will review available <br />documents and data from the City and attend an initial meeting with City staff to refine the <br />proposed scope of work. As part of this task, we will also determine and refine the specific tasks <br />to be completed as part of the site planning effort versus the EIR effort. <br /> <br />Based on the preliminary traffic assignments and in consultation with City staff, we will select <br />the additional study intersections for analysis. <br /> <br />Task 4.2b - Existing Conditions. Fehr & Peers will describe the existing street and highway <br />network and traffic conditions in the vicinity of the site, using collected data and field visits. <br />Fehr & Peers will collect weekday AM and PM and Saturday peak period intersection turning <br />movements, pedestrian, and bicycle counts at the study intersections, and calculate intersection <br />levels of service using the 2000 Highway Capacity Manual (HCM) methods and the <br />Synchro/SimTraffic Software. Existing truck data in the area will be collected and considered in <br />the analysis because the area primarily serves industrial uses. <br /> <br />Mainline freeway and ramp volumes at the 1-880/Marina Boulevard interchange will be obtained <br />from Caltrans. Existing Freeway mainline and ramp junction operations will be analyzed using <br />the 2000 HCM methods. <br /> <br />Fehr & Peers will describe and summarize the operations of local and regional transit services <br />including BART, AC Transit, and local shuttles in the study area. Bicycle and pedestrian <br /> <br />Consulting Services Agreement between <br />City of San Leandro and ElP Associates <br /> <br />Page 25 of 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.