My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2007 0205
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2007
>
Packet 2007 0205
>
8F Consent 2007 0205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 12:45:47 PM
Creation date
2/6/2007 12:31:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/5/2007
Retention
PERM
Document Relationships
_CC Agenda 2007 0205
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2007\Packet 2007 0205
Reso 2007-006
(Reference)
Path:
\City Clerk\City Council\Resolutions\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task 4 - Alternative Refinements <br /> <br />A. Meet intemully to retine alternatives to optimize efficiency. <br />B. Meet with City and County staff to present concepts and develop consensus. <br /> <br />Dcliverahles <br /> <br />Materials for Meeting - Conceptual drawings, order-of-magnitude costs, and traffic operations <br />analysis results of intemally retined altell1atives (presented at meeting). <br /> <br />Con~Qnsus Memo. Documentation of meeting ("B" above) and identification of preferred <br />alternative and/or additional modifications or refinements. <br /> <br />Task 5 - Report <br />A Prepare a Draft Traflic Assessment Report for review by City and County staff <br />B. Based on comments received from both agencies, edit the report and issue a Final Traffic <br />Assessment Report. <br /> <br />Deliverables <br />Draft Traffic Assessment Report <br />Final Traffic Assessment Report <br /> <br />Schedule <br /> <br />...-'.. <br />Schedule <br />.._-^~-- <br />_ 5 w~~~s from rec~iE~_ of Notice toYr:.oceed <br />2 weeks after Task 1 submittal <br />.'_U'_"'_ _. .___._ ___.... <br />2 weeks after Task 2 submittal <br />.~~, --, -~~.,-". --., <br />5 weeks after Task 3 submittal <br />.".~" ---,......-----~ <br />5 weeks after Task 4 submittal <br /> <br />Descript~~~: _ __ ..___ <br />Jask '1 -- Data A~~~l!l~~x~md Collection <br />Task 2 - 0 )e[(~.~i.onal Analysis <br />Ta~}._=-_~ngineering Feasibility_____ . <br />Task 4 - Altell1ative ReJinements <br />.".-,._... ._.~.._~_. <br />T'!.~k 5 - Reports <br /> <br />--.-. ---.-.--- <br /> <br />.......... .- <br /> <br />Notable Exclusions <br /> <br />New model runs. Uthe consultant use the ACCMA model to get the volumes (as opposed to a <br />published tramc report), the consultant will simply extract the volumes from an available run <br />and work with those to develop analysis volumes for each year. <br /> <br />New topographic surveys. The level of detail for this study is consistent with a feasibility study, <br />so available drawings, aClial photographs, etc. will suffice. <br /> <br />IIesperian Boulevard/Lewelling Intersection 'fraffic Assessment <br /> <br />November 13,2006 <br />Page 170f21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.