Laserfiche WebLink
<br />Drawings appropriate for design or construction. This level of detail should only be expended <br />after an altemative has been identified as the project to carry forward. The consultant shall utilize <br />whichever method/software deemed appropriate to prepare the conceptual drawings. <br /> <br />Detailed cost estimates. Cost information shall be prepared on an order of magnitude basis <br />because ofthe preliminary nature ofthis study. The consultant will likely utilize the Caltrans <br />PSR methodology, which identifies a few lD<1:jor construction items, then develops the total cost <br />using a series of multipliers and contingencies. The consultant assumes that guidance shall be <br />received from City and/or County staff for any right-of-way costs needed [()r the estimate. <br /> <br />New work during report revisions. Revisions to the draft report are assumed to be editorial in <br />nature, requiring no new work. If new analysis is requested at this stage, a scope and budget shall <br />be prepared to address it. <br /> <br />Ilcsperian Boulevard/Lewelling Intersection Traftle Assessment <br /> <br />November 13,2006 <br />Page 1801'21 <br />