Laserfiche WebLink
<br />Drawings appropriate for design or construction. This level or detail should only be expended <br />aner an alternative has been identified as the project to carry lorward. The consultant shall utilize <br />whichever method/software deemed appropriate to prepare the conceptual drawings. <br /> <br />Detailed cost estimates. Cost information shall be prepared on an order of magnitude basis <br />because ofthe preliminary nature of this study. The consultant will likely utilize the Caltrans <br />PSR methodology, which identi fies a few major construction items, then develops the total cost <br />using a series of multipliers and contingencies. The consultant assumes that guidance shall be <br />received from City and/or County starr lor any right-of-way costs needed for the estimate. <br /> <br />New work during report revisions. Revisions to the draft report arc assumed to be editorial in <br />nature, requiring no new work. l[new analysis is requested at this stage, a scope and budget shall <br />be prepared to address it. <br /> <br />Hesperian l30ulevarcVLewe II j llg Intersection Traffic Assessment <br /> <br />November 13, 2006 <br />Page IX of21 <br />