Laserfiche WebLink
1,3 `-'— -)U -'I-T'd) :.1)•i -L <br />Form A <br />Notice of Completion & Environmental Document Transmittal <br />SCH # <br />,14uil to State Clearinghouse, PO Box 3044, Sacramento, CA 95812-3044 916/445-0613 <br />Project Title: _ Boat Launch Ramp Relocation- San Leandro Marina <br />Lead Agency: City of San_Leandrci <br />_ Contact Person: <br />Mr. John O'Driscoll_ <br />Mailing Address: 835 East 14th Street <br />_ <br />Phone: <br />_(510) 577-3494 <br />City: San Leandro <br />— — — — — — — <br />Zip. 94577 <br />— — — — — — <br />County: <br />— — — — — — — — — <br />Alameda <br />— — — — — -- <br />— — — — — — — <br />Project Location: <br />Site Plan <br />— — — — — — — — — — — — <br />❑ Land Division (Subdivision, etc-) ❑ Other <br />— — — — — — — — — — — — — — — — — — — — <br />— — — — — — — — <br />Development Type: <br />County: Alameda <br />City/Nearest <br />Community San Leandro <br />❑ Residential: Units_ <br />Cross Streets- Mulford_ Point Drive nr. Monarch Bay Drive <br />Zip Code: 94577 <br />Total Acres- 2 +/- <br />Assessor's Parcel No. 080G-0900-001-08 <br />Section: 4 <br />Twp_ 35 <br />Range: 3W <br />Within 2 Miles: State 11"'y tl 1-880 <br />Waterways: <br />San Francisco Bay _ <br />Mincrnl <br />Base: <br />Airports: Oakland International Railways Amtrak Schools: San Leandro Unified School Dist. <br />— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br />Document Type: <br />CEQA: ❑ NOP ❑ Supplement/Subsequent FIR NEPA: ❑ NOI Other: ❑ Joint Document <br />❑ Early Cons (Prior SCH No.)_ ❑ EA ❑ Final Document <br />FRI Neg Dec ❑ Other_ ❑ Draft EIS ❑ Other <br />❑ Draft FIR ❑ FONSI <br />----------------------------------------- <br />Local---------------------------------------- <br />Local Action Type: <br />❑ General Plan Update <br />❑ Specific Plan <br />❑ Rezone <br />❑ Annexation <br />❑ General Plan Amendment <br />❑ Master Plan <br />❑ Prezone <br />❑ Redevelopment <br />❑ General Plan Element <br />❑ Planned Unit Development <br />❑ Use Pennit <br />❑ Coastal Permit <br />❑ Community Plan <br />Site Plan <br />— — — — — — — — — — — — <br />❑ Land Division (Subdivision, etc-) ❑ Other <br />— — — — — — — — — — — — — — — — — — — — <br />— — — — — — — — <br />Development Type: <br />— <br />❑ Residential: Units_ <br />Acres_ <br />❑ Water Facilities: <br />❑ Orftcc. Sy.JI, <br />Acres_ Employees_ <br />❑ Transportation: <br />Tppe <br />❑ CommercialSq, It. <br />Acres Employees <br />❑ Mining: <br />Mincrnl <br />❑ Industrial: Syfl. <br />Acres _ Employees-- <br />❑ Power: <br />Type_ Watts _ <br />❑ Educational <br />❑ Waste Treotinent <br />7j,pc <br />© Recreational Boat launching <br />facility <br />❑ flaZardoUS Waste: <br />Type <br />❑ Other:_ <br />— — — — <br />— — — — — — — — <br />Funding (approx.): <br />— — — — — — — — — — — — — <br />Federal State $ 1.8M <br />— — — — — — — — <br />_ Total S 1.8M <br />— — — — — — — — <br />Project Issues Discussed in Document: <br />❑ Aesthetic/Visual <br />❑ Agncultural Land <br />❑ Air Quality <br />❑ Archeologicalillistorical <br />❑ Coastal Zone <br />❑ Diamage/Absorption <br />❑ Economic/Jobs <br />❑ Fiscal <br />❑ Flood Plain/Flooding <br />❑ Forest Land/Fire I lazard <br />❑ Geologic/Seismic <br />❑ Minerals <br />❑ Noise <br />❑ Population/Housing Balance <br />❑ Public Services/Facilities <br />❑ Recreation/Parks <br />❑ Schools/Universities <br />❑ Septic Systems <br />❑ Sewer Capacity <br />❑ Soil Erosion/Compaction/Grading <br />❑ Solid Waste <br />❑ Toxicdlazaidous <br />❑ Traffic/Cl rclllan oil <br />❑ Vegetation <br />— — — — — — — — — — — — — — — — — — — — — — — — <br />Present Land Use/Zoning/General Plan Designation: <br />General Plan: General Commercial Zoning: Commercial Recreation <br />❑ A'calci Quality <br />❑ l'atcr Supply/Glollndwater <br />❑ Wetland/Riparian <br />© Wildlife <br />❑ Giowth Inducing <br />❑ Landuse <br />❑ Cumulative Effects <br />❑ Other _ _ <br />Project Description: <br />Remove 3,650 sf. fixed wood pier along with approximately 26 treated timber piling, between the existing fuel dock and proposed <br />launch ramp site, Construct new boat launching facility (ramp, boarding floats, piling, disabled access ) adjacent to fuel do�k�Je2u0q <br />design parking lot at new site to include staging area and boat wash -down area. Refurbish existing restroom. <br />23 <br />