Laserfiche WebLink
c) Result in a change in air traffic patterns, <br />including either an increase in traffic levels or a <br />change in location that results in substantial <br />safety risks? (N/A) <br />d) Substantially increase hazards due to a design <br />feature (e.g., sharp curves or dangerous <br />intersections) or incompatible uses (e.g., farm <br />equipment)? (N/A) <br />e) Result in inadequate emergency access? <br />(Paved access to the site exists; project will <br />not change access for emergency vehicles.) <br />f) Result in inadequate parking capacity? <br />(Existing parking area is adequate; new <br />parking design will improve site access and <br />circulation.) <br />g) Conflict with adopted policies, plans, or <br />programs supporting alternative transportation <br />(e.g., bus turnouts, bicycle racks)? (N/A) <br />XVI. UTILITIES AND SERVICE SYSTEMS B <br />Would the project: <br />a) Exceed wastewater treatment requirements of <br />the applicable Regional Water Quality Control <br />Board? (N/A) <br />b) Require or result in the construction of new <br />water or wastewater treatment facilities or <br />expansion of existing facilities, the construction of <br />which could cause significant environmental <br />effects? (N/A) <br />c) Require or result in the construction of new <br />storm water drainage facilities or expansion of <br />existing facilities, the construction of which could <br />cause significant environmental effects? <br />(Existing drainage facilities to be upgraded <br />on-site for boat wash -down, and launch <br />ramp.) <br />d) Have sufficient water supplies available to <br />serve the project from existing entitlements and <br />resources, or are new or expanded entitlements <br />needed? (No new entitlements needed) <br />e) Result in a determination by the wastewater <br />treatment provider which serves or may serve the <br />project that it has adequate capacity to serve the <br />project's projected demand in addition to the <br />provider's existing commitments? (N/A) <br />f) Be served by a landfill with sufficient permitted <br />capacity to accommodate the project=s solid <br />waste disposal needs? (No projected <br />significant increase in solid waste generation) <br />Potentially Less Than Less Than No <br />Significant Significant with Significant Impact <br />Impact Mitigation Impact <br />Incorporation <br />I i X <br />I I I X <br />I X <br />I I i X <br />! X <br />X <br />X <br />X <br />I I I X <br />I I X <br />I i X <br />envcheck wpd-12/30/98 -13- <br />