<br />Boat Launch Ramp Relocation - San Leandro Marina <br />Environmental Checklist <br />Evaluation of Environmental Factors <br /> <br />Biological Resources <br /> <br />IV.a) <br />The proposed project wIll involve the construction of a 6,000 sf. launch ramp, installation <br />of 2,500 sf. of boarding floats, six (6) concrete plling to secure the boarding floats; <br />Removal of the existing 3,650 sf. wood pier at the proposed launch ramp site, along wIth <br />approximately 26 treated timber piling; placement of approximately 450 cy. of fill at the <br />eXIsting wood pier site, and removal and reinstallation of approximately 200 cy of rock <br />slope protection at the pier site, plus 150 cubic yards of rock protection at tlle new launch <br />ramp. Best Management Practices to maintain water qual1ty will be employed for the <br />removal and replacement of project components for material and debns contallDnent, and <br />pile installation, as agreed upon by the regulatory agencies and the City of San Leandro. <br /> <br />Listed species possibly fou0d in the South San Francisco Bay are the Westem Snowy <br />Plover, Califomia Least Tem, and Pacific Hening. It is not anticipated that the removal <br />and new construction associated with the project will affect these species. The Snowy <br />Plover and Least Tern are both shorebirds VI'hose habitat are sandy beadles and mudflats, <br />not associated with the relocation of the boat launch ramp within the marina. The Pacific <br />Hening do not spawn over mud substrates found on the east SIde of San Francisco Bay. <br />Spawning and rearing nonnally occurs from December into March, which would also be <br />outside the window being considered for construction. None of these species have been <br />observed at the project site. <br /> <br />IV.d) <br /> <br />The proposed project \vill involve relocation of boat launching facilities of nearly <br />equivalent dimensions and volume to the eXlst1l1g launching facility to be removed under <br />a separate project The existing launching facility will be closed to the public upon <br />completion of the new facility There will be a net increase of approxImately 700 total <br />cubic yards of solid fill and approximately 500 sf. of floating fill that IS not cllltlclpated La <br />1l1terfere wIth the movement of any native reSIdent fish or vnldhfc over that presently <br />exi sting. <br /> <br />IV.e) <br /> <br />Although included by reference in the Long-Ten11 Managment Strategy (LTMS) for the <br />San Francisco Bay, and shown in the San Francisco Bay Plan, there are no hsted wildlife <br />species of concem or priority uses indicated, respectively, in eIther document for the <br />project site. <br />