Laserfiche WebLink
<br />of-way, streets, structures, utilities, facilities, or other similar property. <br />Construction activities carried on in violation of this Article may be enforced as <br />provided in Section 4-11-1130, and may also be enforced by issuance of a stop <br />work order and/or revocation of any or all permits issued for such construction <br />activity. <br /> <br />B. Construction activity shall not create dust, noise or safety hazards for adjacent <br />residents and properties. Dirt and mud shall not be tracked onto Business Center <br />Drive, Davis Street, or Doolittle Drive from the project site during construction. <br /> <br />C. Standard construction dust control procedures, such as wetting, daily roadwashing <br />and other maintenance functions to control emissions, shall be implemented at all <br />times during outdoor construction. Dust generating activities such as grading, <br />excavation, paving etc., shall be scheduled the early morning and other hours <br />when wind speeds are low. All construction activities entailing soil disturbance <br />shall cease when winds exceed 30 miles per hour as an hourly average. <br /> <br />D. The applicant shall prepare a construction truck route plan that would restrict <br />trucks to arterial streets that have sufficient pavement section to bear the heavy <br />truck traffic, thereby minimizing noise and traffic impacts to the community. The <br />construction truck route plan shall be reviewed and approved by the City Traffic <br />Engineer prior to receipt of the grading permit. <br /> <br />E. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m. There shall be <br />no truck hauling activity on Saturdays, Sundays and legal holidays. <br /> <br />F. Procedures with the highest noise potential shall be scheduled for daylight hours, <br />when ambient noise levels are highest. <br /> <br />G. The contractor(s) shall be required to employ the quietest among alternative <br />equipment or to muffle/control noise from available equipment. <br /> <br />H. All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day; 2) Trucks <br />hauling construction materials shall be covered with tarpaulins or other effective <br />covers; 3) Streets surrounding demolition and construction sites shall be swept at <br />least once per day; and 4) Paving and planting shall be done as soon as possible. <br />City shall charge developer, and developer shall pay, for all costs of sweeping city <br />streets in the vicinity of the project as necessary to control dust and spillage. <br /> <br />X. GENERAL REQUIREMENTS <br /> <br />A. The use of the pumper trucks onsite and the handling of sewage waste transfer, <br />and including the maintenance of the pumper trucks and the portable toilets, shall <br />be in compliance with all applicable federal, state and local health and safety <br /> <br />PLN2006-00 101 <br />Recommended Conditions of Approval <br /> <br />Page 10 of 11 <br />February 22, 2007 <br />