My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2007 0402
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2007
>
Packet 2007 0402
>
3B Public Hearing 2007 0402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 12:39:34 PM
Creation date
3/28/2007 3:46:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/2/2007
Retention
PERM
Document Relationships
_CC Agenda 2007 0402
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2007\Packet 2007 0402
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />G. UNDERGROUNDING OF OVERHEAD UTILITIES <br /> <br />1. Undergrounding of Utilities: All utilities on-site and along the project frontage on <br />Davis Street shall be installed or converted to underground facilities. <br /> <br />2. Sub-divider shall place all utility services for the project underground, including <br />any service connections to the existing overhead utilities along Davis Street. <br /> <br />3. Prior to approval of the Final Map, the Sub-divider shall pay underground utilities <br />conversion fee for the project frontage on Davis Street as per Master Fee schedule. <br />The fee based upon First Quarter, 2002 is $154.05 per lineal feet. <br /> <br />H. FEES AND DEPOSITS <br /> <br />1. Design review fees, development impact fees, permit fees, inspection fees, and <br />any other fees charged by the City or other reviewing agencies for the review, <br />approval, pennitting, and inspection of the above listed public improvements shall <br />be paid by the Sub-divider. <br /> <br />2. Prior to approval of the fmal map, Sub-divider shall enter into a Subdivision <br />Improvement Agreement and shall post security in the amounts and forms <br />acceptable to the City Engineer. <br /> <br />3. Sub-divider shall pay Development Fee for Street Improvement (DFSI) based on <br />the type of building and its use. Fee will be due prior to issuance of the building <br />permits. <br /> <br />I. PRIVATE IMPROVEMENTS <br /> <br />1. All of the streets and services within the project boundary must be privately <br />maintained, with the exception of the existing public sanitary sewer and storm <br />drain mains within the project area. <br /> <br />2. All of the sanitary sewer and storm drainage facilities constructed within the <br />boundaries of the project shall be privately owned and maintained by the property <br />owner's Association, unless otherwise noted on the approved improvement plans, <br />up to the point of connection of the systems to an existing public facility. <br /> <br />J. STREET TREES AND LANDSCAPING <br /> <br />1. The Sub-divider shall prepare a landscaping and irrigation plan for review and <br />approval by the Development Services and Engineering and Transportation <br />Department. The landscape plan shall include species, size, quantities, and <br />locations. All landscaping shall be designed with efficient irrigation practices to <br /> <br />Revised Recommended Conditions of Approval <br />PLN2002-00031 Bayside Business Park <br /> <br />November 4, 2002 <br />Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.