My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2007 Environmental Science Associates
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2007
>
Agmt 2007 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2007 12:25:51 PM
Creation date
4/5/2007 9:03:24 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/2/2007
Retention
PERM
Document Relationships
Agmt 2009 Environmental Science Associates
(Amended by)
Path:
\City Clerk\City Council\Agreements\2009
Reso 2007-044
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />SITE DESCRIPTION <br /> <br />The subject site comprises of the existing Bay Trail that runs south of the Monarch Bay Drive. <br />Paved trail exists for most of the section for about 1.5 to 2 miles. There are some slope failures <br />on the marsh side of the trail as a result of damage (washed out) during the earlier storms. The <br />marsh is inhabited by special status species (i.e. California clapper rail, salt-marsh harvest <br />mouse), therefore consultation with US Fish & Wildlife (USFWS) through the US Army Corps <br />of Engineers is required on this project. In addition, permit approvals are required from Bay <br />Conservation and Development Commission (BCDC), and Regional Water Quality Control <br />Board (RWQCB). <br /> <br />SCOPE OF SERVICES <br />ESA will submit a permit application to the US Army Corps of Engineers (Corps) for this <br />project. In addition, ESA will provide a technical memorandum to be submitted with the Corps <br />application that will focus on avoidance and mitigation measures, which will lessen effects of the <br />proposed project on special status species. ESA will be required to attend up to two meetings <br />with USFWS Staff and one meeting with City Staff during the Corps permit application approval <br />process. Furthermore, ESA will respond to information requests and comments from the Bay <br />Conservation and Development Commission (BCDC), and Regional Water Quality Control <br />Board (RWQCB) pertaining to permit applications previously submitted by the City. ESA will <br />respond to all agency comments on the applications and/or project and obtain permit approvals <br />from Corps, BCDC, and RWQCB. <br /> <br />COST ESTIMATE AND SCHEDULE <br /> <br />Time is of the essence, therefore the Consultant will, during the course of the study, keep the <br />City and all other interested parties advised of the schedule and relevant issues. The fee for the <br />above described services will be as per the attached spread sheet (Exhibit B). Services will <br />commence within two weeks following City's authorization. This cost estimate requires that <br />ESA attend up to two meetings with USFWS Staff and one meeting with City Staff. <br /> <br />ADDITIONAL SERVICES <br /> <br />Additional services can be provided on a time-and expense basis under separate servIce <br />agreements. <br /> <br />Shoreline Riprap Construction <br />147-42-148 <br /> <br />March 13, 2007 <br />Page15of17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.