My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent 2007 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2007
>
Packet 2007 0507
>
8K Consent 2007 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 11:12:14 AM
Creation date
5/4/2007 10:02:45 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/7/2007
Retention
PERM
Document Relationships
_CC Agenda 2007 0507
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2007\Packet 2007 0507
Reso 2007-066
(Reference)
Path:
\City Clerk\City Council\Resolutions\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />STEVEN J. GROSSMAN <br />Director of Avialion <br /> <br />Mr. William Schock <br />City of San Leandro <br />Civic Center, 835 E. 14th Street <br />San Leandro, California 94577 <br /> <br />WILLIAM E. WADE <br />Airport General Manager <br /> <br />Oakland Internalfonal Airport <br />One Airport Drive. Box 45 <br />Oakland. CA 94621 <br /> <br />Telephone: (510) 563-3300 <br />Fax:(510) 568-8418 <br /> <br />April 17,2007 <br /> <br />Re: Residential Airport Noise Insulation Program Phase I <br /> <br />Dear Mr. Schock: <br /> <br />The Port has received the City of San Leandro Cost Estimate and G.E. Chen Construction, <br />Inc.'s Bid Contract Price Schedule for the San Leandro Residential Airport Noise Insulation <br />Program Phase I ("Phase I Program"). This letter is to confirm that the Port and the City of <br />San Leandro have undertaken to Mmeet and confer" to determine the final budget for the <br />Phase I Program as provided for in Section 2(i) of the 2000 Settlement Agreement between <br />the Port and City (the "Settlemenr). <br /> <br />The proposed final budget is within the acceptable range of the preliminary budget that the <br />Port reviewed and concurred with prior to the contractor's submission of the contract price <br />schedule for the Phase I Program. The Port agrees to provide funding for the Phase I <br />Program within the scope of insulation measures provided for in Section 2(f) of the <br />Settlement, as amended by the 2002 Addendum to the Settlement. Funding provided by the <br />Port shall not exceed contract price for the Phase I Program, which the City has represented <br />to be $2,224,074.29 including a 10% contingency for unanticipated change orders and <br />permit fees. <br /> <br />If you agree with the above, please acknowledge this letter and return a copy to me. <br /> <br />Sincerely, <br /> <br />HECFIVED <br />('AN 1 E- AN DR <br />c") " L - _ I , II <br /> <br />A~~ <br /> <br />Steven Grossman <br />Director of Aviation <br /> <br />,r, pr,J " ft, ')[1[1'1 <br />t:', t~. .~: ;.~ (~ ( <br /> <br />t~UIL[lING &. SAF f) \ <br />SFRV/CFS <br /> <br />cc: Deborah Ale-Flint <br /> <br /> <br />Enclosed: Total Cost Contractor Valuation Phase1 Table <br /> <br />530 Water Street _ Jack London Square _ P.O. Box 2064 <br />Telephone: (510) 627-1100 . Facsimile: (510) 627-1826 _ <br /> <br />_ Oakland, California 94604-2064 <br />Web Page: www.portofoakland.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.