My WebLink
|
Help
|
About
|
Sign Out
Home
Finance Highlights 2007 0320 v2
CityHall
>
City Clerk
>
City Council
>
Committees
>
Finance Committee
>
Finance Highlights 2007 0320 v2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2007 4:03:11 PM
Creation date
5/30/2007 10:45:11 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
3/20/2007
Retention
PERM
Document Relationships
Finance Highlights 2007 0320 v1
(Superseded)
Path:
\City Clerk\City Council\Committees\Finance Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SAN LEANDRO APPARATUS REPAIR ACTUAlS FOR OCTOBER 2006 - DECEMBER 2006 <br /> <br /> AlCO Reg OT Reason for <br />RIO Unit Identifer Date labor OT labor Parts Freight Tax RIO total Hrs Hrs repair Work performed <br />06919 132 Parade 10/31/06 $ 75.00 $ $ 75.00 10 0.0 BIT inspection 90 Day tnspection. <br />06930 134 Reserve 1 11/06106 $ 7500 $ $ 7500 10 0.0 BIT inspection 90 Day Inspection <br />06926 135 3451 11/02/06 $ 75.00 $ $ 75.00 10 0.0 BIT inspection 90 Dav Inspection <br />06897 135 3451 11109/06 $ 75.00 $ - $ 2559 $ - $ 2.24 $ 102.83 1.0 0.0 Call to station Replace pluq on cord for on board charqer. <br />06989 135 3451 12/04/06 $ 75.00 $ $ 75.00 1.0 0.0 Call to slation <br /> Adjust alternator bells. <br />061018 135 3451 12/12/06 $ 75.00 $ $ 098 $ - $ 0.09 $ 7607 1.0 0.0 Repair Drivers side compartment door under cross lay <br /> wont stay closed Repair latch and adjusLO <br /> Repair enqine compartment Hqht <br /> . <br />061033 135 3451 12/19/06 $ 75.00 $ $ 44.97 $ - $ 3.93 $ 123.90 1.0 0.0 Call to stalion Replace pump shift swilch cover. 0 <br /> Check rear amber <br />06915 136 3449 10/31/06 $ 112.50 $ - $ 112.50 15 00 BIT inspection 90 Day Inspection <br /> Annual service 0 <br /> Replace right side suction valve Warranty 0 <br /> Replace drivers seal belLO <br /> Replace 2 1/2" side suction screen 0 <br /> Check relief valve operation, ok.O <br /> Replace rotted plumbing for left rear <br /> dlscharge.O <br /> Install pull drain for wet air tank.r <br /> Rebuild all drain valves 0 <br /> Replace all worn door gaskets 0 <br /> Set 5" discharge relief valve to 200psi.r <br /> Rebuild leaking pump master drain valve.r <br /> Rebuild tank drain valve, leaking. <br /> Rebuild leaking tank fill valve <br /> Rebuild leaking tank to pump, and 5" discharge <br /> valves 6 <br /> . Replace pump hour gauge Was 762.0 now <br /> 0.00 <br /> Repair many compartment lights.O <br /> Tighten power steering pump to try and repair <br /> oil leak, will monitor <br /> Replace leaking heater core.6 <br /> Repair right front door to close properly. <br /> Readjust hinge and striker 0 <br /> Replace several dash switches, pilot lights <br /> ou\.2 <br /> Intake relief valve leaking and not functioning <br /> properly. Rebuild valve. <br />06982 136 3449 12/14/06 $ 4,725.00 $ - $ 2,097.76 $ 26.23 $ 183.55 $ 7,032.54 63.0 0.0 Service Replace worn and leakina hose reel swivel <br /> <br />1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.