My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2007 0716
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2007
>
Packet 2007 0716
>
3B Public Hearing 2007 0716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2007 12:20:38 PM
Creation date
7/13/2007 12:20:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/16/2007
Retention
PERM
Document Relationships
_CC Agenda 2007 0716
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2007\Packet 2007 0716
MO 2007-071
(Reference)
Path:
\City Clerk\City Council\Minute Orders\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
View images
View plain text
<br />14340 Washington Avenue, PLN2007-00027 <br /> <br />4 <br /> <br />July 16, 2007 <br /> <br />Permits and/or Variances Granted <br /> <br />The project complies with all Zoning Code requirements pertaining to setback requirements, <br />height requirements, maximum lot coverage, and maximum floor to area ratio (FAR) in the IL <br />and CC Districts, with the exception of the maximum FAR in the CC District. In this case, the <br />only exception that is proposed is that the FAR of the planned development exceeds the CC <br />District requirement by 0.06, where 0.50 is the maximum FAR permitted (Zoning Code Section <br />2-686). <br /> <br />Environmental Review <br /> <br />An Initial Study/Mitigated Negative Declaration and Mitigation Monitoring Plan for the project <br />described above were previously approved by the City Council on March 6, 2006. The <br />application to renew the same project proposal does not result in any substantive effects. Thus, <br />the existing approved Mitigated Negative Declaration and Mitigation Monitoring Plan is <br />adequate and no further environmental review is required. <br /> <br />Code Compliance Review <br /> <br />Not applicable <br /> <br />Board/Commission Findin2s <br /> <br />The Planning Commission reviewed this application on June 14, 2007. At the conclusion of the <br />public hearing, the Commission recommended approval of the planned development with similar <br />conditions from last year's approval, however with a stricter time constraint that the application <br />for building permit with required construction documents be made to the Building and Safety <br />Services Division within 30 days of City Council's approval and that the development project be <br />substantially completed within six months of the City issuing the building permit. <br /> <br />Summary of Public Outreach Efforts <br /> <br />This matter was noticed for the July 16, 2007 City Council meeting. A legal advertisement for <br />the public hearing was placed in the Daily Review newspaper; public hearing notification letters <br />were mailed to property owners and business owners within 300 feet of the subject property; and <br />public notification placards were posted on the utility poles adjacent to and near the subject <br />property. <br /> <br />Fiscal Impact <br /> <br />Not applicable <br /> <br />Bud2et Authority <br /> <br />Not applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).