Laserfiche WebLink
<br /> <br />Central Alameda County <br />Freeway System <br /> <br />Financially Unconstrained <br />LATIP Project List <br /> <br /> <br />-; <br /> <br />Financially Unconstrained <br />LATIP Project List <br /> <br />A Widen connector, NB 1-238 to NB 1-880 <br />B Washington & Lewelling IC <br />C Extend 1-880 HOV North to Hegenberger <br />o Add 1-880 aux. lanes, A St. to Winton <br />E Add NB off-ramp, 1-880 to Industrial <br />F Add 1-880 aux. lanes, <br />Industrial to Whipple <br />G Whipple ICTruck improvements <br />H On-ramp modincations (locations TBO) <br />I Adaptive ramp metering (corridor-wide) <br />J Integrated Corridor Management (ICM) <br />K 1-8801Davis IC improvement <br />L 1-880/Marina IC improvement <br />M 1-880/A St. IC improvement <br />N 1-880/Winton IC improvement <br />o SR 92/lndustriaIIC improvement <br />P Strobridge/I-S80 improvements <br />Q Redwood/I-S80 IC funding <br />R 1-880/SR 92 reliever- <br />Clawiter/WhiteselllC <br />Reduce ramp merge/weave confiicts <br />(locations TBO) <br />T Managed lanes (locations TBO) <br />U Soundwalls (locations TBO) <br /> <br />1 1-238 Widening <br />2 Redwood Rd. IC <br />3 Route 92/1-880 IC <br />4 Lewelling Widening <br />5 5R-238 Downtown <br />Loop/Corridor <br />6 West A 5t Extension <br />7 Whitesell 5t Extension <br />8 Tennyson Extension <br />9 Marina Blvd Widening <br />10 1-880 5B HOV Lane Extension <br />from Hegenberger Rd, to <br />Marina Blvd. <br /> <br />P',6"H Complete by 2015 <br />Complete by 2030 <br /> <br />RtVl~Ondalr: 06-].5-07 <br />