Laserfiche WebLink
<br />2. PLANS AND SPECIFICA TIONS <br /> <br />The District provides funding for services required to maintain public improvements, located within <br />various public areas within the boundaries of the District. <br /> <br />2.1. General Description of the Public Improvements <br /> <br />The total program of improvements which are the subject of the District are briefly described as <br />follows, and are more specifically described in Section 2.2. <br /> <br />The operating, maintaining, servicing and replacing of the following public improvements, located in <br />the following public areas: <br /> <br />a) The Storm Water Lift and Detention Pond (SWLS&DP), located on Parcel "B" of Tract 6636, <br />including accessory structures, access roads, walls, gates and fences, and drainage facilities; <br /> <br />b) The Storm Water Treatment Pond, located in Development Phase 1 B (Tract 5548), including <br />accessory outfall/inlet structures, access roads, fences, gates, drainage facilities, and <br />pedestrian pathway; <br /> <br />c) The "Buffer" area and trail, inclusive of the passive park adjacent to Phase 2B (Tract 6809), <br />including accessory improvements, fencing, signage, drainage facilities and landscaping, said <br />facilities are located adjacent to the westerly boundaries of Phase 1 B, 2B, and 3 (Tract 6810), <br />and adjacent to the northerly boundaries of Phase 2B and 3; <br /> <br />d) Tidal marsh lands (commonly known as "North Marsh", "East Marsh" and "Bunker Marsh."); <br /> <br />e) Sound walls on both sides of Lewelling Boulevard, easterly from the Southern Pacific railroad <br />(SPRR) tracks to Wicks Boulevard, exclusive of that portion of the sound wall which is <br />located on the property of the Sandev Mobile Home Park as an enclosure for a pad mounted <br />electrical transformer; <br /> <br />f) Lewelling Boulevard improvements, including curb and gutter, sidewalk and landscaping, <br />exclusive of any decorative street pavements, said facilities are located between the <br />Lewelling Boulevard "roundabout" and Wicks Boulevard. <br /> <br />2.2. Detailed Description of Improvements within the District <br /> <br />The following items are contained in that Agreement among Roberts Landing, Inc., dba Citation <br />Homes Central, a California corporation, Santa Clara Land Title Company, and the City of San <br />Leandro, said Agreement being dated April 15, 1996, said items to be funded by the Heron Bay <br />Maintenance Assessment District: <br /> <br />a) Design, construction, and maintenance of Water Circulation and Drainage improvements as <br />depicted in that certain document entitled "Water Circulation and Drainage Plan" dated July <br />19, 1991, and prepared by ESA subject to regulatory agency amendments; <br /> <br />b) Design, construction, and maintenance of the Shoreline Trail and trail extension through open <br />space lands adjacent to and serving the Heron Bay development; <br /> <br />Heron Bay Maintenance District Annual Report - City of San Leandro <br />Prepared by NBS - Fiscal Year 2007/08 <br /> <br />2-1 <br />