My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2007 0730
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2007
>
Packet 2007 0730
>
8F Consent 2007 0730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2007 4:16:51 PM
Creation date
7/27/2007 4:16:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/30/2007
Retention
PERM
Document Relationships
_CC Agenda 2007 0730
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2007\Packet 2007 0730
Reso 2007-107
(Reference)
Path:
\City Clerk\City Council\Resolutions\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />rates will be applied to the proposed medical center to estimate the parking supply for both <br />employees and members at each phase of the project. <br /> <br />This analysis will assume that there will be no shared parking between the Retail Shopping <br />Center and Mixed-Use Residential Project and the medical center. Parking mitigation will <br />address potential opportunities for shared parking between the components of the project. <br /> <br />Task 4.2i: Alternatives Analysis <br /> <br />DA will qualitatively evaluate up to four project alternatives (including 2015 plus additional <br />retail) to determine whether they would lessen or eliminate the significant impacts identified for <br />the proposed project. This evaluation will be based on a comparison of the relative trip <br />generation characteristics of the alternatives. <br /> <br />Task 4.2j: Traffic Report <br /> <br />DA will document the transportation analysis from the above tasks in a stand-alone Traffic <br />Impact Analysis (TIA) for review by the City. The TIA report will include the following <br />elements: <br />1. Summary <br />2. Introduction, including project description and study scope <br />3. Existing Conditions <br />4. Project Analysis <br />5. Impacts <br />6. Mitigations <br />7. Project Alternatives <br />8. Summary and Conclusions <br /> <br />Peak hour intersection traffic volumes for each analysis scenario will be displayed in figures. All <br />traffic calculations will be included in a technical appendix. <br /> <br />This report will form the basis for the transportation section of the DEIR, to be prepared by EIP. <br />As described above, coordination with City and Caltrans will be key in the development of <br />appropriate mitigation measures for transportation impacts. <br /> <br />Task 4.2k: Inputs for Air Quality and Noise Analysis <br /> <br />DA will provide ErP with transportation inputs and measures used in the analysis of air quality <br />and noise impacts to be done by ErP. These may include daily and peak hour traffic volumes, <br />intersection LOS, VMT, VHT and average system travel speeds. <br /> <br />Consulting Services Agreement between <br />City of San Leandro and Erp Associates <br /> <br />Page 28 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.