Laserfiche WebLink
D. Prior to Certificate of Occupancy approval, the applicant shall install all <br />landscaping consistent with the approved landscape plans. <br />E. Prior to Certificate of Occupancy, all final planting and irrigation facilities shall be <br />completely installed to the satisfaction of the Community Development Director. <br />F. Any existing tree, shrub, and/or groundcover on the subject property that is <br />damaged or destroyed by construction activities shall be replaced with a like or <br />comparable species prior to Certificate of Approval. <br />G. Landscaped areas shall be watered, weeded, pruned, fertilized, sprayed, and/or <br />otherwise maintained as necessary. Plant materials shall be replaced as needed to <br />maintain the landscaping in accordance with the approved plans. <br />H. Prior to issuance of building permits, the applicant shall submit proof that <br />demolition and remodel work related to the existing single-family unit complies <br />with applicable lead abatement guidelines as provided by the Alameda County <br />Health Department. <br />IV. ENGINEERING REQUIREMENTS <br />A. Pursuant to Government Code Section 66020, including Section 66020 (d) (1), the <br />City HEREBY NOTIFIES the applicant for this Project that the 90-day approval <br />period (in which the applicant may protest the imposition of any fees, dedications, <br />reservations, or other exactions imposed on this Project by these Conditions of <br />Approval) will begin on the date of the conditional approval of this Project. If the <br />applicant/property owner fails to file a protest within this 90-day period, complying <br />with all of the requirements of Government Code Section 66020, they will be <br />legally barred from later challenging any such fees, dedications, reservations or <br />other exactions. <br />B. Site Improvement Plans for all on-site and off-site improvements shall be prepared <br />by a Registered Civil Engineer and approved by the City Engineer prior to the <br />issuance of Building Permits for the project. All improvements shall be designed <br />and constructed in accordance with the City's Design Standards, Specifications and <br />Standard Plans, unless otherwise specifically approved by the City Engineer. <br />C. All details of site construction, including, but not limited to, on-site pavement <br />slopes, illumination, drainage, etc., are subject to the approval of the City Engineer. <br />D. Design review fees, development impact fees, permit fees, inspection fees, and any <br />other fees charged by the City or other reviewing agencies for the review, approval, <br />permitting and inspection of the above listed public improvements shall be paid by <br />the Applicant. <br />Agreement to Conditions October 16, 2006 <br />PLN2006-00031 Page 6 of 15 <br />