My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2007-150
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2007
>
Reso 2007-150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2007 10:05:26 AM
Creation date
12/26/2007 10:05:26 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/17/2007
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />SSMP Plan Development and Schedule <br />• The legal authority to prohibit discharges to the system and identify measures to <br />prevent SSOs and blockages caused by FOG; <br />• Requirements to install grease removal devices (such as traps or interceptors), design <br />standards for the removal devices, maintenance requirements, BMP requirements, <br />record keeping and reporting requirements; <br />• Authority to inspect grease producing facilities, enforcement authorities, and whether <br />the Enrollee has sufficient staff to inspect and enforce the FOG ordinance; <br />• An identification of sanitary sewer system sections subject to FOG blockages and <br />establishment of a cleaning maintenance schedule for each section; and <br />• Development and implementation of source control measures for all sources of FOG <br />discharged to the sanitary sewer system for each section identified in (f) above. <br />City's Plan: <br />The City currently has in force a comprehensive FOG Program that addresses each of the <br />elements required by the SSMP. We have plans to improve our program as necessary to track <br />permitted interceptor sites. An updated plan will be included in the final SSMP. <br />VIII SYSTEM EVALUATION AND CAPACITY ASSURANCE ELEMENT <br />The City shall prepare and implement a capital improvement plan (CIP) that will provide <br />hydraulic capacity of key sanitary sewer system elements for dry weather peak flow conditions, <br />as well as the appropriate design storm or wet weather event. At a minimum, the plan must <br />include: <br />• Evaluation: Actions needed to evaluate those portions of the sanitary sewer system that <br />are experiencing or contributing to an SSO discharge caused by hydraulic deficiency. The <br />evaluation must provide estimates of peak flows (including flows from SSOs that escape <br />from the system) associated with conditions similar to those causing overflow events, <br />estimates of the capacity of key system components, hydraulic deficiencies (including <br />components of the system with limiting capacity) and the major sources that contribute <br />to the peak flows associated with overflow events; <br />• Design Criteria: Where design criteria do not exist or are deficient, undertake the <br />evaluation identified in (a) above to establish appropriate design criteria; and <br />• Capacity Enhancement Measures: The steps needed to establish ashort- and long-term <br />CIP to address identified hydraulic deficiencies, including prioritization, alternatives <br />analysis, and schedules. The CIP may include increases in pipe size, I/I reduction <br />programs, increases and redundancy in pumping capacity, and storage facilities. The CIP <br />shall include an implementation schedule and shall identify sources of funding. <br />• Schedule: The Enrollee shall develop a schedule of completion dates for all portions of <br />the capital improvement program developed in (a)-(c) above. This schedule shall be <br />reviewed and updated consistent with the SSMP review and update requirements. <br />City's Plan: <br />Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.