Laserfiche WebLink
EXHIBIT B <br />COMPENSATION SCHEDULE AND HOURLY FEES <br />1. Supplemental Topographic Surveying <br />2. Offsite Public Improvement Plans: <br />3. Storm Water Pollution Prevention Plan (SWPPP): <br />4. Meetings: <br />5. Traffic Signal Design and Signing and Striping: <br />6. Joint Trench Design: <br />7. Improvements to existing outfall structure: <br />8. Engineer Estimates and Greenbook Specifications <br />9. Allowance for Reimbursable Expenses (Mailing, Printing, etc.) <br />10. Coordination with Caltrans <br />TOTAL <br />$5,000 <br />$55,000 <br />$4,500 <br />$4,000 <br />$25,000 <br />$39,650 <br />$8,000 <br />$2,500 <br />$5,000 <br />$17,000 NTE <br />$165,650 <br />Eden Road Design <br />Project Number 964-82-061 <br />January 22, 2008 <br />Page 17 of 18 <br />