Laserfiche WebLink
6. Joint Trench Design: <br />Includes street lighting design and coordination with various utility companies <br />7. Improvements to existing outfall structure: <br />Development of plans to tie the new storm drainage system for the new improvements to <br />an existing drainage outfall structure Excludes wetlands consulting and permitting <br />process with regulatory agencies <br />SCHEDULE: <br />65% Construction Documents and Cost Estimate <br />95% Construction Documents and Cost Estimate <br />100% Construction Documents and Cost <br />Estimate <br />DELIVERABLES: <br />4 weeks from receipt of `Notice to <br />Proceed' <br />2 weeks from receipt of City's <br />70% review comments <br />2 weeks from receipt of City's <br />95% review comments. <br />Construction documents and estimates will be delivered to the City on hardcopies per the <br />schedule above. Final signed construction documents and estimates will delivered to the <br />City, including electronic files of AutoCad 2000 or later format plans, Microsoft Word <br />format Specifications in Greenbook format. <br />2. Caltrans encroachment permit, which allows the work on Doolittle. <br />CITY TO PROVIDE: <br />Geotechnical study report <br />2. Title block in AutoCAD 2000 electronic file format. <br />EXCLUSIONS <br />1. Subdivision mapping or plats and legal descriptions for easements. <br />2. The cost to dig up or expose existing utilities, if it becomes necessary to do so in order to <br />preclude potential grade conflicts with proposed utilities. <br />3. City plan checking fees, mailing or reproduction charges. <br />4. Construction Administration. <br />Eden Road Design January 22, 2008 <br />Project Number 964-82-061 Page 16 of 18 <br />