Laserfiche WebLink
PERMIT NO. 6-78 <br />City of San Leandro <br />(Issued on May 24, 1978, As <br />Amended Through November 13, 2007) <br />CORRECTED AMENDMENT NO. SEVEN <br />Page 4 <br />permit. Amendment No. Five authorized a time extension for the completion of work until <br />October 1, 1983. Work authorized in Amendment No. Six must commence prior to December <br />31, 2005 or this amended permit will become null and void. Such work must also be diligently <br />pursued to completion and must be completed by December 31, 2006. Work authorized in <br />Amendment No Seven must commence prior to July l 2009 or this amended permit will <br />become null and void Such work must also be diligently pursued to completion and must be <br />completed by Jul 12012. <br />D. The ori~*inal project will result in approximately 12,141 square feet of new Bay fill for <br />small boat berths, the construction of a two-lane public launching ramp, the slight expansion of <br />the fuel dock and the construction and improvement of 5,600 square feet of new public access. <br />E. Work authorized under Amendment No Seven will result in approximately 2 590 square <br />feet of new Bay fill for the boat launch ramp the placement of 2 325 square feet in the shoreline <br />band for the apron and approach of the boat launch ramp improvement of an approximate 6 to <br />13 foot wide 224 foot loner public access~athway and the removal and replacement of the <br />bathroom and parking lot. <br />II. Special Conditions <br />The amended authorization made herein shall be subject to the following Special Conditions, <br />in addition to the Standard Conditions in Part IV: <br />A. Specific Plans and Plan Review <br />Plan Review. No work whatsoever shall be performed at any location pursuant to this <br />permit, as amended, until final precise site, engineering, grading, architectural, and <br />landscaping plans for that portion of the work have been submitted to, reviewed, and <br />approved by or on behalf of the Commission. Architectural plans submitted for <br />review shall include all outside architectural building details and fixtures, including, <br />but not limited to, the location, dimensions, and color of all outside signs and other <br />fixtures. In each instance, plan review shall be completed within sixty (60) days after <br />receipt of the plans to be reviewed. Approval or disapproval shall be based upon <br />conformity with the permit, as amended, and upon a determination by or on behalf of <br />the Commission that the proposed construction will be in accordance with (a) the <br />information presented to and recommendations of or on behalf of the Engineering <br />Criteria Review Board for engineering plans; and (b) the information presented to <br />and the recommendations of or on behalf of the Design Review Board for grading, <br />site, architectural and landscaping plans. <br />Work authorized in Amendment No Seven shall be built eg neralIy in conformance <br />with the plan entitled "Relocate Boat Launch Ramp C-01 to 17 "prepared by <br />PS/JY/SY as revised through March 28 2007 The work authorized under <br />