Laserfiche WebLink
EXHIBIT B <br />Project Description <br />The project involves the construction of approximately 1,000 feet or 0.2 mile of new Bay Trail <br />spine from the southwest corner of the Metropolitan Golf Links to Oyster Bay Regional <br />Shoreline in San Leandro. The proposed trail would include a 12 -foot -wide, Class I trail with <br />two -foot shoulders and a 10 -foot -wide, 350 -foot -long bridge that crosses San Leandro Slough. <br />