|
nr.
<br />TITLE 6, Chapter 4
<br />FEES
<br />§ 6.4100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San
<br />LeandroAdministrativeCode (SLAC) or the general laws of the State of California.
<br />�,.,�, _ - , ,,,, _. ,.
<br />r Description Current Fee
<br />Reference
<br />...
<br />Proposed FY 2008-09 Fees 7
<br />,,,,,, ,,... , ...,. J
<br />- N9allw�1NP�2�' _ _-- �Sw�iwW�Nurs�av�Jr��nWm�mvnm /w�s�rw. -�.
<br />PUBLIC WORKS SHRVIC�S [lERARiMENi LltvrOfllBtlt6(t fi19YYit of �hdS10n
<br />;_.. ___
<br />�, mammRh� ✓rrrAa rs�w�-�ma.��S.�PMrr'4 �mmtt;ww .nc ,a`:1; -+re �-�e F.�,... �: wN _ ,.x., ve^�
<br />1 :Hazardous Materials Storage
<br />__
<br />;SLMC 3-3-100
<br />._. j
<br />_ _ � _ _ _ _
<br />_ _ _ _
<br />A. Annual fees for storage of combustible liquids, corrosives,
<br />(2)
<br />: $101.00
<br />�Based on CPI 3.8% Increase rounded
<br />'flammable gases, flammable liquids, flammable solids,
<br />;Quantity Range 1 $ 97.00
<br />;nonflammable gases, organic peroxides, other regulated materials,
<br />m.... ,oxidizers
<br />Quanta Range 2 $194 00_
<br />Quantity_
<br />201 DO
<br />Based on CPI 3,8%, Increase rounded
<br />;Quantity Range 3 $280.00
<br />- .
<br />_$291,00
<br />_ _�._:
<br />Based on CPI 3.8 % Increase rounded
<br />.. ,.,:
<br />m a..,, , ..,. _�. e... -o-1-1111-11-
<br />-dq, , ,
<br />,,,., �� mays,._..,.
<br />Quantity Range 4 $367 00
<br />Quantity
<br />r�,_.
<br />., .,,.,
<br />$381.00
<br />Based on CPI 3.8% Increase rounded
<br />_.
<br />Quantity Range 5 $458.00
<br />$476.00
<br />-$140.00
<br />Based on CPI 3.8% Increase rounded
<br />�B. Annual Fees for Storage of�O��'�
<br />Radioactive Materials 1
<br />�� ��������
<br />$135.00
<br />���� ,
<br />Based on CPI 3.8% Increase rounded��
<br />C Aboveground Tank Installation Permit (3)
<br />o „„,,,.
<br />F rst Tanak
<br />$280.00
<br />$291.00
<br />Based on CPI 3.8 % Increase rounded
<br />Each Additional
<br />$97.00
<br />$101.00
<br />Based on CPI 3.8% Increase rounded
<br />�_ _. ,.-,--a��
<br />2 Accidental Release Program: Review of RMP by:
<br />SLMC 3-3-400
<br />ro
<br />„
<br />$11..
<br />_...... ,..m�9 �
<br />„ $123 00/hr
<br />o Increase rounded
<br />Based on CPI 3 8% as , e
<br />Outs dte consultant
<br />D Cost plus
<br />Direct Costs plus 10%
<br />_._
<br />r
<br />$119.00
<br />m$123.00
<br />se rounded
<br />Based on CPI 3.8 % Increa
<br />3 Underground Hazardous Materials Storage
<br />SLMC 3-3-265
<br />�.
<br />A Annual Operating Permit (4): Each Tank
<br />$102 00
<br />$106.00
<br />Based on CPI 3.8% Increase rounded
<br />_._,.T._.
<br />m _ „._ ,. _ _. ,_, ..., ............
<br />B. NewTanklnstallation(5)
<br />n. .._ ............-
<br />r n�� , ,._, ......_,.� .m
<br />_ _.m..-�°
<br />m
<br />First Tank
<br />F
<br />$776.00
<br />$806.00
<br />Based on CPI 3.8% Increase rounded...
<br />Each Addltional
<br />$189.00
<br />$196 00
<br />Based on CPI 3.8% Increase rounded
<br />C Tank Removal Repair Alterahons (6)
<br />First Tank $377 00 j.00 Based on CPI 3.8% Increase rounded
<br />Each Additional $189.00 $196.00 _ m Based on CPI 3.8% Increase rounded
<br />_ _.., ...- _ .._ _ , .._,,..
<br />D Minor Repairs and Alterations $119 00/hr $123.00/hr Based on CPI 3.8% Increase rounded
<br />4 Contaminated Site Cleanup Program
<br />A. Oversight of Remedial Investigations and Actions _.. ,... ,
<br />City Staff $119.00/hr. $123.00/hr Based on CPI 3.8% Increase rounded
<br />..,,, o._. -,,, �,> r , �,�rc,., _ ,:., . mow, ,..�,A .,. .��m ,.
<br />Outside Consultant Direct Costs plus 10
<br />(1) Includes permit processing and two Inspections annually (one annual and one re -inspection) for compliance with the Uniform Fire Code, review of the HMBP, and review of all emergency response plans
<br />nt Ran e 1 Less than or equal to 500 pounds 55 allons or 2 000 cubic feet at STP.
<br />(21 Qua ,.. ,tea ,. - m, e .
<br />Quant Ran e 2 Greater than 500 ounds 55 allons or 2 000 cubic feet at STPr but Mss than ore ual to 5 000 ounds, 550 allons or 20,000 cubic feet at STP, res chvely
<br />4 P m., m.. ._,,.
<br />w. , . .. , ..r ..,.., P ..,_. . _.� m, ..__�,�.w.... , W. .., ,,,.r.._..�.. ,.m,...,, �,,
<br />Quant Ran e 3 Greater than 5,000 ounds, 550 allons, or 20,000 cubic feet at STP, but less than ore ual to 50,000 pounds, 5,500 allons or 200 000 cubic feet at STP respectively.
<br />... ,..,. qm l,., or w.,.�w.... ,bac t � �, � .w ..� ,-w. ..,.
<br />Quandt Ranke 4 Greater than 50,000�oud55,500 gallons or 200,000 cubic feet at STP, but less than or ec(ual to 500000 pounds, 55 000 allons or 2 000 000 cubic feet at STP respectivel ............
<br />_ Quantit Ranke 5 Greaterthan 500,000 ou�nds, 5-5,000 allons, ar2,000 000 cubic feet at STP _ _ ______ _
<br />(3) Includes plan review, field Inspections, and permit processing. Time for Inspections Is two hours for the first tank and one hour each additional tank. Additional
<br />insPectlons will be charged at urrent hourl
<br />(4) Includes permit processing andthe ctwo Inspections annually (one annual and one reinspection) for compliance wRh applicable federal and state underground tank andlor hazardous waste laws and regulations and/or the
<br />char ed at the current hour rate.
<br />Uni/orm Flre Code Additional Inspections wlll be . __ ? q_ ,,,,, ,„,,,,.q ,,.,,, ,,. .IK :,
<br />(5) 'Includes plan review, field Inspections, and permit processing. Time for inspections /s four hours for the first tank and two hours each additional tank. Additional Inspections will be charged at the current hourly rate.
<br />6 Includes /an reviews, field Inspections and permit processing. Time for inspections Is two hours for the first tank and two hours each additional tank. Additional inspections will be charged at the current hourly O` P P P P 9- P P 9 rate.
<br />G:\FEES\200&09 Fees\Fee schedule
<br />31
<br />4/30/2008
<br />
|