To 3 h p each
<br />-$14,40
<br />Over 3 to 15 h p each
<br />O
<br />-$24.35
<br />Over 15 to 30 h.p., each�t$27.30�
<br />Over 30 to 50h.p. each
<br />,-e o�, ..
<br />Over 50 hhp, each
<br />Solar system, including collectors, piping, tanks and exchanger,
<br />$42.75
<br />ea chsystem�
<br />`Energy Conservation: review of plans and/or energy forms for all
<br />=Direct Cost (1) with a minimum charge
<br />buildings subject to the California Energy Commission's
<br />of $56.00
<br />a en not covered byybwldm� perm t
<br />conseryation re�ufabons (whodo
<br />'�
<br />Heating Ventilating and Air Condition or General Mechanical
<br />.Issuance Fee - ��
<br />$27.00 plus the amount shown for each
<br />:heating, ventilating and air conditioning item`
<br />(of work and each general mechanical item
<br />of work.
<br />For the roughing in of sheet metal or approved circulating air pipe in
<br />connection with any heating or cooling system, including air inlet or
<br />i
<br />outlet connections registers and diffusers
<br />�� � ..�..... ���
<br />_
<br />Plan Check, when applicable ,.,'
<br />,�,
<br />Direct Cost (1)
<br />,� :.__,.,. � �.. �.,:.,,,a, a�o �e. ..
<br />Minimum Fee
<br />5$56.00 PLUS each item as shown
<br />For w Residential Construction and additions with valuations over
<br />'we
<br />of building permit fee
<br />$100,000 mcludin all HVAC re esters ducts gas Ime and vents
<br />„.,
<br />-,10%
<br />Eacchh register over two
<br />$2.60
<br />aa, d.�m,.
<br />Heating cooling and ventilating appliances
<br />.... ..
<br />w.
<br />Gravity or forced air furnace, each
<br />$13.65
<br />'. ,. w....
<br />Residential air conddioning system —",-,- °
<br />$11 35.
<br />Unit heater, each�.?.-
<br />Recessed wall heater, each
<br />$11,35
<br />Suspended space heater, each
<br />� �
<br />111.35
<br />,Gas range - d,omestiq each
<br />.$8.25
<br />Gas range - commercial, each
<br />$10.0_5
<br />Gas clothes dryer, domestic, each
<br />x$8.25
<br />Gas clothes dryer, commercial each
<br />$10.05
<br />Gas domestic refrigerator, each
<br />t$8.25
<br />.Conversion burner each
<br />$10.05
<br />_
<br />Circulating type room heater, each
<br />$10.05
<br />Industrial and commercial heating equipment, each
<br />$14.05
<br />Alterations or changes of any control system or ventilating system
<br />$11.35
<br />from on mal installation __ __
<br />_
<br />Small borer of not over 15,000 BTU per hour, steam table
<br />25
<br />sterilizers, laboratory bumers, coffee urn burners, gas plates and
<br />similar devices, each
<br />Direct Cost- - hourly personnel charge plus a factor of 100% for hinge benefits, overhead and indirect costs
<br />G:\FEES\2008-09 Fees\Fee Schedule
<br />9
<br />4/30/2008
<br />
|