Laserfiche WebLink
Heating, Ventilating and Air Condition or General Mechanical (Continued) <br />Fans or blowers connected to any heating system which are not part$8.25 <br />of the furnace, each <br />Commercial range hoods, including vent, each <br />$30.9 <br />Refrigeration system - commercial/industrial, each system <br />'$47,40 <br />Minimum (one or two flues) <br />x$9.55 <br />Each flue over two (each) <br />Ventilating System_ for Kitchen, Bath, etc <br />u_m (one or two systems)�� <br />$9.55 <br />W, <br />Ech stem over two <br />$8.25 <br />Over30to50h.�� <br />p., each <br />ncinerators—domestiq eac � ����� � ����� <br />�� <br />$139 <br />9 <br />_h , <br />Incinerators — commerciaVindustrial, each <br />'$54.6 <br />Smog control afterburners, commercial/industrial, each system <br />;$37.10 <br />Refrigeration system - commercial/industrial, each system <br />'$47,40 <br />Condensate drain system each inlet <br />$3.60����� <br />r................... <br />To3h.p each <br />� - <br />Over 3 to 15 h.p. each <br />........ <br />$21.35 <br />� �.� w a� a <br />Over 15 to 30 h.p., each <br />$27.30 <br />Over30to50h.�� <br />p., each <br />Over 50 h.p., each <br />$69.80 <br />Heat pumps-,'each� <br />Cooling Systems: <br />To 100,000 BTU each mm <br />'�$18.80 .. .�.. <br />Over 100,000 to 500 000 BTU each � � � � " .�,....... � <br />$29 60�.. <br />Over 500 000 to 1,000,000 BTU each � � � � � � <br />.. �.... <br />$39,15 <br />a, ,. s... .. ...e� <br />Over 1,000,000 BTU, each <br />$48.65 <br />EvaporatNe Cooler, each <br />a. <br />$19.55 <br />Industral Processing Equipment_ _ <br />m <br />Ovens, dryers, cookers, fryers kettles, etc. each _ <br />$30.90 v� <br />m _ a �. <br />Industrial processing exhaust systems, each system <br />$30.90 <br />Manu #actured spray booths, each <br />=$30 90 _ <br />_ <br />Energy Conservation review of plans and/or energy forms for all <br />Direct Cost (1) wdh a <br />:buildings subject to the California Energy Commission's <br />of $54.00 <br />;conservation regulations (when not covered by building permit) <br />1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, over) <br />G\FEES\2008-09 FeesTee Schedule <br />costs <br />4/30/2008 <br />