Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE m <br />ITLE 6 Chapter 4 FEES <br />§16.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />urrent Fee Reference Proposed FY 1008 09 Fees <br />A. Issuance Fee'$27.00 plus the amount shown for each <br />electrical item involved in the work, as <br />7shown below <br />B. Minimum fee x$56.00 plus each item installed, as r <br />shown below <br />C Plan Check, when applicable �D t <br />,For new Residential Construction and additions with valuations over ,13 %of <br />its service and panels_ <br />$100 000 Included all circuits, _ _ <br />Cireu ts: Installation, replacement or alteration of each electrical circuit (Incluc <br />:15 to 20 ampere circuit 1�, , m g1-�l <br />;$9.00 <br />21 to 30 ampere circuit11_­11_1111__1­­_­ "� <br />$9 80� <br />;41 to 50 ampere circuit `�_ <br />� <br />x$10.80 <br />51 to 70 ampere circuit <br />����� <br />`$11.60 <br />ii t� <br />71 to 100 ampere circ <br />�aR <br />$14.70 <br />_ <br />101 to 200 ampere circuit � <br />$21.35 <br />r2 0 0 ampere capacity <br />'$21.65 <br />100 an <br />Trolty and plug-in type bus -ways per linear foot <br />x$0,50 <br />Lighting fixtures, brackets, pendants, cord drops, outlets, <br />$1.05 <br />receptacles, switches and other lamp holding devices, each on <br />_existinq circuits <br />outlet assemblies, light tracts, per linear foot <br />$0.75 <br />Tempo ower service pole or pedestal, each <br />x$26 25 <br />Temporary distribution system (for construction sites, Xmas tree lots, <br />$26.25 <br />etc each __ _ <br />Service or Service Changer <br />Services over 600 volts: <br />Up to 200 amp, each <br />'$92.95 <br />ver 200 amp, each �T <br />$92.$92. 955 <br />Services 600 volts or le,ss,each <br />related outlets, switches, receptacle and <br />thereof <br />Up to 200 amp capacity $31.95 <br />Over 200 amp capacity $64.10 <br />Service disconnecting means for additional meter _ x$4.90 up to a maximum of $74.40 each�r <br />Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and Indirect costs <br />GIFEES\2008-09 Fees\Fee Schedule <br />5 <br />4/30/2008 <br />