SAN LEANDRO ADMINISTRATIVE CODE FINANCE
<br />TITLE 6 Chapter 4 FEES
<br />§ 6.4.100: FEES The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California.
<br />3 Electrical Permit (Continued)
<br />_
<br />(connection on new or existing
<br />ti
<br />Fixed Residential A liances connecng _circuits):,
<br />pp
<br />_
<br />_
<br />Ele nc range, dryer, combination washer and dryer, furnace,
<br />$9.55
<br />- water heater, etc., each
<br />Heaters (air, water and other kinds), furnaces and welding
<br />'Up to and including 20kW or kVA
<br />machines: For each DW or kVA and fraction of either.
<br />$20.10
<br />Over 201kW or kVA to and including
<br />"50kW.or kVA $49.70
<br />_:.__..
<br />.,
<br />�.,� _ — _ .. �o.� e.d.,,,,, _ _,
<br />,... �e
<br />Over 501kW or kVA to and including
<br />_. „ , ®,
<br />kW or kVA $79.60
<br />® �e . ,, , . _ , .a , ....
<br />Over SOkW or kVA $98^10
<br />Fixed commercial appliances (connection on new or existing circuits)
<br />no exc eeding 1HP kW or kVA
<br />Medical/dental equipment, food cabinets, show cases, laundry
<br />$9.55
<br />machines motion picture machnesgSUSI ltd liRhtin etch
<br />_
<br />Fire protection systems, other than smoke detectors0
<br />Smoke detectors
<br />$4 10
<br />�. �q_ ,st am—n,' .,.., .,,,� an,,,w,
<br />"Motors, Includiing starting and controlling apparatus therefore and
<br />winn between same and motor
<br />_ v .� -_,.----"Ill _a,_ . ---- I I _-1__.--,_.,
<br />� 1- .. a. .
<br />Up to and including 1 h.p.
<br />$4.00
<br />.$9.55
<br />p to 10 h p.
<br />10.1 hp.to13hp.
<br />"13,7".30—
<br />$30.40
<br />._ �s_
<br />ro 1'i) o,Q6 ,p
<br />13.1 h p. to 16 h.p.
<br />;$37.10
<br />.1
<br />�. 16.1 h p. to 19 h.p.
<br />$44.30
<br />e.m„
<br />_. _
<br />19.1 h.p. to 22 h.p
<br />$51.25
<br />22.1 h.p. to 25 h.p.
<br />25.1 h.p. to 28 h p.
<br />t$65.15
<br />�$72.10tin�
<br />28.1 h.p. to 31 h.p.
<br />31.1 h.p. to 34 h p. �. „ m ..ee.e . ,
<br />��� ����
<br />$79.45
<br />roti<s�..,,a
<br />I._,
<br />Above34.h.p. ..
<br />s.
<br />$79.85
<br />For changes, renewals or replacement of said apparatus, where no
<br />:One-half (1/2) of the amount set fort
<br />chan es In wlrn 19,are necessary,,,above
<br />_
<br />For motor generator sets, balancer sets, dynamotors and
<br />150% of fees set forth above, with a
<br />converters, including control apparatus
<br />maximum for one such machine of
<br />b$79 85.... .,,,
<br />'Generators, including switchboard and controlling apparatus
<br />therefore and wiring between same and generator: for each rated
<br />maximum of kW or kVA and fraction thereof
<br />;1 to 20
<br />1$19.55
<br />1--l-1-1-1 . ... ..... .
<br />-21 to50 .,,m
<br />21
<br />a
<br />$51.50
<br />51 and above
<br />$79.85, .� M ...
<br />Transformers and balance coils, when not embodied in or included����
<br />with apparatus for which fee is herein specifically prescribed: rated
<br />`.
<br />;for each rated kVA and fraction thereof
<br />n _ � n
<br />$19.85
<br />21 to 50
<br />;$49.45
<br />51 to 80
<br />x$79.45
<br />�81 and above �
<br />=$92.95 9
<br />GAFEES�2008-09 FeesTee Schedule
<br />6
<br />4/30/2008
<br />
|